Some investors ask questions on the investor interactive platform: consult Dong Mi. The first phase production capacity of Wenda magnesium aluminum is 1.5 billion? With the release of production capacity in the Ningde era, will the second phase of the plant be planned as soon as possible? how far is the plant with a capacity of 2.1500 tons? when will it be put into production? Thank you.
Sanxiang New Materials (603663.SH) said on the investor interactive platform on November 4 that Wanda magnesium Aluminum has a production capacity of 30, 000 tons in the first phase, with an output value of about 1.5 billion yuan after production. Wanda magnesium Aluminum will arrange the production capacity planning for the second phase according to the actual production and operation situation. The project with an annual output of 1500 tons of special ceramics is in steady progress and has not yet been put into production.


![Giá than tăng vọt thổi bùng thị trường magie, hai tháng tích lũy cuối cùng cũng phá vỡ, cắt giảm sản lượng và giảm tồn kho báo hiệu đợt tăng giá tiếp theo [Phân tích SMM]](https://imgqn.smm.cn/usercenter/mLwgx20251217171723.jpeg)
![Giá Magie Tăng Vọt Do Chi Phí Đẩy, Nhu Cầu Yếu Khiến Đà Tăng Khó Bền Vững [Đánh Giá Magie Hàng Tuần Của SMM]](https://imgqn.smm.cn/usercenter/rUQIB20251217171723.jpeg)
