Tangshan partially exempts steel mills from winter cuts 

Published: Nov 6, 2018 11:58
Steel mills in Tangshan will face eased cutbacks of around 18.59 million mt in blast furnace capacity in 2018/2019 winter

SHANGHAI, Nov 6 (SMM) – Steel mills in Tangshan of Hebei province will face eased cutbacks of around 18.59 million mt of blast furnace capacity in the 2018/2019 winter, compared with original cuts of 19.74 million mt, as the government exempted some mills from cuts. 

Cuts this year account for some 31.55% of overall capacity, down from 33.8% in the previous order a month ago

Hebei Jinxi Iron & Steel and Tangshan Ganglu Iron & Steel received exemptions of 1.05 million mt and 650,000 mt, respectively. For mills that planned to move out of 'environmentally-sensitive' areas, cuts were lowered by 15% from their previous-scheduled levels, SMM learned. 

An environmentally-sensitive area is an agricultural area that requires special protection because of its landscape, wildlife or historical value. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Apr 23, 2026 19:50
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Read More
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
Feihushan Lead-Zinc Mine Project Advances in Heilongjiang, Aims for 300,000 mt Annual Ore Capacity
[Lead-Zinc Ore Market Dynamics] A project advancement meeting for the Feihushan lead-zinc mine was held this week in Huzhong District, Heilongjiang, chaired by Guan Jingjun, Deputy Secretary of the District Party Committee and District Governor. The total investment for the Feihushan lead-zinc polymetallic mine development project is expected to be 396.7111 million yuan, with all required funds to be self-raised by the enterprise. Upon completion, the project will have an annual capacity of 300,000 mt of raw ore (including 200,000 mt of lead-zinc ore and 100,000 mt of iron ore). The mineral processing products will be lead concentrates, zinc concentrates, and iron ore concentrates, with a service life of 14 years (excluding a 4-year construction period).
Apr 23, 2026 19:50
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Apr 23, 2026 19:27
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Read More
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
Yingkou FTZ to Approve 5,000 mt/year Waste Lead-Acid Battery Collection Project
[Waste Lead-Acid Battery Market Dynamics] It was reported that the website of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone recently published the "Public Notice of the Management Committee of the Yingkou Area of the China (Liaoning) Pilot Free Trade Zone on the Acceptance of the Environmental Impact Assessment Report for the Waste Lead-Acid Battery Collection (5,000 mt/year) Project of Fenghuan (Yingkou) Environmental Technology Co., Ltd." Upon completion, the project will have a waste lead-acid battery turnover capacity of 5,000 mt/a and a maximum storage capacity of 100 mt.
Apr 23, 2026 19:27
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Apr 17, 2026 18:05
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Read More
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
Bank of Jiujiang Hefei Branch Approves 280M Yuan Credit Line for Anhui Lukong Environmental Protection
[Secondary Lead Market Update] It was reported that recently, the Hefei Branch of Bank of Jiujiang, in response to the characteristics of the secondary lead industry — "capital-intensive raw material procurement and urgent production turnover needs" — assembled a professional team and customized a comprehensive financial service plan, ultimately approving a credit line of 280 million yuan for Anhui Lukong Environmental Protection Co., Ltd.
Apr 17, 2026 18:05