SHFE Copper Strengthens (2017-6-29)

Published: Jun 29, 2017 16:29
SHFE 1708 copper opened at RMB 47,060/mt and closed at RMB 47,430/mt, up RMB 610/mt.

SHANGHAIM, Jun. 29 (SMM) – On Thursday, SHFE 1708 copper opened at RMB 47,060/mt and then advanced to RMB 47,350/mt with rising ferrous metals. Later, the contract hovered at highs, up to as high as RMB 47,520/mt, and closed at RMB 47,430/mt, up RMB 610/mt. Positions reduced 6,554 to 189,000 and trading volumes increased 83,528 to 274,000 lots. Positions of SHFE 1709 copper increased 20,512 to 177,000 and those of all SHFE copper contracts rose 53,000.

Copper Price to Get Limited Upward Strength from Jinchuan’s Maintenance, SMM Reports

SHFE 1708 copper will keep rising in a short term.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
White Cliff Reports High-Grade Copper Intercepts at Rae Project, Including 21.1% Cu
13 mins ago
White Cliff Reports High-Grade Copper Intercepts at Rae Project, Including 21.1% Cu
Read More
White Cliff Reports High-Grade Copper Intercepts at Rae Project, Including 21.1% Cu
White Cliff Reports High-Grade Copper Intercepts at Rae Project, Including 21.1% Cu
White Cliff Minerals has reported high-grade drilling results from the Danvers target at its Rae copper project in Nunavut, Canada. Highlight hole DAN26012 intersected 19.8 metres grading 6.64% copper from 152.4 metres depth, including 7.6 metres at 11.38% copper and 3 metres at 17.68% copper. The interval also contained 1.5 metres grading 21.1% copper, marking the strongest result reported at the project to date. The company said drilling has now confirmed copper mineralization over a strike length of approximately 2.6 km, while surface mineralization suggests the broader system may extend beyond 4 km. White Cliff plans to continue drilling across the remaining target area before August to further evaluate resource growth potential.
13 mins ago
Copper Recycling Remains a Key Focus of Global Recycling Investments
17 mins ago
Copper Recycling Remains a Key Focus of Global Recycling Investments
Read More
Copper Recycling Remains a Key Focus of Global Recycling Investments
Copper Recycling Remains a Key Focus of Global Recycling Investments
Nearly 500 recycling projects are under development globally, with copper recycling among the fastest-growing segments. Rising demand for sustainable metal supply is driving investment into scrap processing and secondary copper production.
17 mins ago
Osisko Metals Reports High-Grade Drill Results at Gaspé Copper Project
18 mins ago
Osisko Metals Reports High-Grade Drill Results at Gaspé Copper Project
Read More
Osisko Metals Reports High-Grade Drill Results at Gaspé Copper Project
Osisko Metals Reports High-Grade Drill Results at Gaspé Copper Project
Osisko Metals has released the first results from its 2026 drilling campaign at the Gaspé copper project in Quebec, Canada. Hole 30-1196 intersected 80 metres grading 1.93% copper from a depth of 196 metres, including a higher-grade interval of 30 metres grading 3.49% copper. The company noted that several of the new intercepts are located within areas currently classified as waste rock in the mine plan, creating potential to add mineralized resources without expanding the pit footprint. Gaspé is one of the largest undeveloped copper resources in eastern North America, and Osisko continues to advance drilling aimed at resource expansion and future project development.
18 mins ago
SHFE Copper Strengthens (2017-6-29) - Shanghai Metals Market (SMM)