Donghua Technology Signed a Contract for an 800,000 mt Integrated Wind and Solar Power Hydrogen-to-Ammonia Project in Inner Mongolia, Undertaking a 200,000 mt Green Ammonia EPC Project

Published: Mar 13, 2026 10:43

Recently, Donghua Engineering Technology Co., Ltd. (Donghua Technology) released a major contract announcement. On March 5, 2026, in Hefei, Anhui province, the company formally signed an EPC general contracting agreement for Phase I, Stage 1 Green Ammonia Works of the 800,000-mt/year wind and solar power hydrogen-ammonia integration project with Renewable Green Hydrogen Energy (Inner Mongolia) Co., Ltd. (“Renewable Green Hydrogen”), supporting the scaled implementation of Inner Mongolia’s green hydrogen and green ammonia industry.

I. Core Project Overview

The project signed this time is the first-phase works of the 800,000-mt/year wind and solar power hydrogen-ammonia integration project. The plant’s design capacity is **200,000 mt/year of green ammonia**. The scope of construction covers a complete supporting system including newly built process production units, storage and transportation units, auxiliary facilities, utilities, and front-of-plant living facilities. Relying on wind and solar power renewable energy to produce hydrogen and synthesize green ammonia, it will build a clean, low-carbon chemical industry chain.

II. Key Contract Information

  • Contract Value: 2.026 billion yuan (provisional estimate)

  • Schedule Arrangement: The contract duration is approximately 27 months, and the planned mechanical completion date is expected to be June 18, 2028

  • Scope of Contracting: Donghua Technology is fully responsible for the full-process EPC work, including pre-project consulting, design, procurement, construction and installation, testing and detection, cooperation for completion acceptance, operation support, construction-period insurance, handover, and start-up commissioning guidance.

III. Project Entity and Performance Assurance

The entity responsible for the project’s construction and operation is Renewable Green Hydrogen Energy (Inner Mongolia) Co., Ltd. Its controlling shareholder is Yijingxing Green Hydrogen Energy Investment (Hainan) Co., Ltd., and the ultimate controlling party is Renewable Green Hydrogen Energy Technology Asia Co., Ltd. Currently, the project has completed the investment project filing with the Inner Mongolia Autonomous Region, and the partners have sufficient performance capability, laying a solid foundation for the smooth advancement of the project.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
1 hour ago
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Read More
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
NDRC Approves Hami-Dunhuang Third 750 kV Transmission Line Project
Recently, the National Development and Reform Commission (NDRC) issued the Reply on the Approval of the Hami–Dunhuang Third 750 kV Transmission Line Project, formally approving the Xinjiang Hami–Dunhuang Third 750 kV Transmission Line Project. The implementation of this project was of great significance for improving the backbone structure of the main power grid in Northwest China, strengthening the mutual support capacity between the Gansu and Xinjiang power grids, and enhancing Xinjiang’s capacity to absorb new energy. According to previously disclosed environmental impact assessment information, the project had a total static investment of 1.3509 billion yuan and was scheduled for completion in March 2027.
1 hour ago
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
2 hours ago
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Read More
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
Jijing UHV DC Project Enters Final Feasibility Stage, Aiming for 2029 Operation
On March 12, it was learned from State Grid Jilin Electric Power Co., Ltd. that the project to transmit power from the Songliao Clean Energy Base in Northeast China to North China (the “Jijing UHV DC Project”) officially entered the final stage of the feasibility study. According to the plan, the project is expected to complete project approval in 2026, enter the substantive construction phase in 2027, and be completed and put into operation in 2029.
2 hours ago
China Launches 2026 Pilot Program for County-Level EV Charging Infrastructure Improvements
2 hours ago
China Launches 2026 Pilot Program for County-Level EV Charging Infrastructure Improvements
Read More
China Launches 2026 Pilot Program for County-Level EV Charging Infrastructure Improvements
China Launches 2026 Pilot Program for County-Level EV Charging Infrastructure Improvements
China’s Ministry of Finance launched the 2026 application process for pilot programs to address shortcomings in county-level charging and battery swapping infrastructure. For charging and battery swapping stations powered by PV generation, if the amount of electricity “generated for self-use” exceeds 40% of total charging volume, the annual total charging volume of such “generated for self-use” electricity may be converted at 1.2 times.
2 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?sign in here