December Imported Copper Cathode Exceeds Expectations with Over 3.7 Million mt Expected for 2024 Annual Imports [SMM Analysis]

Опубликовано: Jan 20, 2025 18:47
[SMM Analysis] According to data from the General Administration of Customs, China imported a total of 3.7388 million mt of copper cathode in 2024, up 6.49% YoY. Among them, December imports were 370,400 mt (up 2.93% MoM, up 18.88% YoY). In 2024, China exported a total of 457,500 mt of copper cathode, up 63.86% YoY. Among them, December exports were 16,700 mt (up 44.06% MoM, up 55.61% YoY).

 

》Check SMM Copper Prices, Data, and Market Analysis

》Subscribe to View SMM Historical Spot Metal Prices

》Click to Access the SMM Copper Industry Chain Database

SMM, January 20:

        According to data from the General Administration of Customs, China imported a total of 3.7388 million mt of copper cathode in 2024, up 6.49% YoY. Among this, December imports reached 370,400 mt, up 2.93% MoM and 18.88% YoY. In 2024, China exported a total of 457,500 mt of copper cathode, up 63.86% YoY. Among this, December exports reached 16,700 mt, up 44.06% MoM and 55.61% YoY.

        From the import side, December copper cathode imports totaled 370,400 mt, up 2.93% MoM and 6.49% YoY. Among this, imports from the DRC reached 163,100 mt, up 30.21% MoM, accounting for 44.05% of total imports. In mid-to-late December, the SHFE/LME price ratio opened significantly, leading to improved transactions in the US dollar copper market and a large volume of port arrivals being imported. Additionally, the cancellation of the copper semis export tax rebate policy, which was implemented in December, increased downstream processing enterprises' demand for imported copper.

        From the export side, October copper cathode exports totaled 16,700 mt, rebounding from November on a MoM basis. The main growth came from Vietnam and Taiwan, China. Since the export window remained closed, domestic smelters showed limited proactive export activity.

        Looking ahead, SMM expects copper cathode imports in January 2025 to decline MoM from December 2024. On one hand, December-January is the peak negotiation period for US dollar copper long-term contracts, and shipments are expected to be executed starting February 2025 after contracts are finalized. Shipment volumes in January-February are relatively low. On the other hand, with the Chinese New Year holiday approaching in January, port arrivals before and after the holiday are expected to decrease due to logistics arrangements. Overall, copper cathode imports in January 2025 are likely to decline MoM from December 2024. On the export side, the export profit window in January remains closed, and domestic smelters are expected to show limited proactive export activity. Copper cathode export volumes in January are expected to remain basically flat.

Заявление об источниках данных: За исключением общедоступной информации, все остальные данные обрабатываются SMM на основе общедоступной информации, рыночного общения и с опорой на внутреннюю базу данных и модели SMM. Они приведены только для справки и не являются рекомендациями для принятия решений.

По любым вопросам или для получения дополнительной информации, пожалуйста, свяжитесь: lemonzhao@smm.cn
Для получения дополнительной информации о доступе к нашим исследовательским отчётам обращайтесь:service.en@smm.cn
Связанные новости
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
1 минуту назад
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
Читать далее
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
SHFE Approves Warehouse Capacity Adjustments for Copper, Aluminum, and Zinc Futures in Shanghai
On September 2, the Shanghai Futures Exchange (SHFE) announced that it had approved Shanghai Yuqiang Supply Chain Management Co., Ltd. to adjust its designated warehouse capacity for copper, aluminum and zinc futures. At the storage site at No. 3501 Gonghe New Road, Shanghai, the company will cancel its copper and aluminum futures storage qualifications, while its approved zinc futures warehouse capacity will remain unchanged at 20,000 tonnes. At the site at No. 2222 Jichuan Road, Minhang District, Shanghai, its zinc futures storage qualification will be canceled, while approved capacity will be adjusted to 45,000 tonnes of copper and 5,000 tonnes of aluminum.
1 минуту назад
Eldorado оценивает расширение мельницы на 43% на McIlvenna Bay по мере приближения рудника к коммерческой добыче
4 минут назад
Eldorado оценивает расширение мельницы на 43% на McIlvenna Bay по мере приближения рудника к коммерческой добыче
Читать далее
Eldorado оценивает расширение мельницы на 43% на McIlvenna Bay по мере приближения рудника к коммерческой добыче
Eldorado оценивает расширение мельницы на 43% на McIlvenna Bay по мере приближения рудника к коммерческой добыче
Eldorado Gold рассматривает возможность расширения перерабатывающих мощностей на медно-цинковом руднике МакИлвенна-Бей в Саскачеване на 43% — с 4 900 до примерно 7 000 тонн в сутки, а также внедрение линии по извлечению серебра и свинца. По мере выхода предприятия на коммерческую добычу в третьем квартале 2026 года в переработку доступно более 400 000 тонн материала. Действующий план технико-экономического обоснования предусматривает среднегодовое производство меди на протяжении срока эксплуатации рудника на уровне около 41 миллиона фунтов (18,6 тыс. тонн).
4 минут назад
One and One обеспечивает более 2 000 тонн сырья для новой линии по извлечению металлов на Филиппинах
5 минут назад
One and One обеспечивает более 2 000 тонн сырья для новой линии по извлечению металлов на Филиппинах
Читать далее
One and One обеспечивает более 2 000 тонн сырья для новой линии по извлечению металлов на Филиппинах
One and One обеспечивает более 2 000 тонн сырья для новой линии по извлечению металлов на Филиппинах
Компания One and One Green Technologies обеспечила более 2 000 тонн сырья, включая медьсодержащие, никелевые и электронные шламы, для своей новой линии по извлечению металлов на Филиппинах. Ведётся монтаж оборудования, запуск производства запланирован до конца 2026 года. Предприятие будет извлекать медь, никель, золото и серебро из промышленных и электронных отходов, создавая новые локальные мощности по переработке сложного вторичного металлосодержащего сырья.
5 минут назад
December Imported Copper Cathode Exceeds Expectations with Over 3.7 Million mt Expected for 2024 Annual Imports [SMM Analysis] - Shanghai Metals Market (SMM)