Chihong Zn&Ge Signs First Anode, Cathode Plate Sales Order

Published: Jun 26, 2017 17:32
Chihong Zn&Ge signed its first order for 3.2m2 anode and cathode plate recently with Wenshan Zinc & Indium, according to cnmn.com.

SHANGHAI, Jun. 26 (SMM) – Chihong Zn&Ge signed its first order for 3.2m2 anode and cathode plate recently with Wenshan Zinc & Indium, according to cnmn.com.

It sold 3,180 pieces of 3.2m2 anode plate and 5,472 pieces of cathode plate with the former company.

Zhuzhou Smelter to Build 8-10 Bln Yuan Copper-Lead-Zinc Base

This means the company’s anode and cathode plate is recognized by markets.

The article is edited by SMM and is provided for information purpose only. SMM assumes no liability and does not warrant the accuracy, reliability or completeness of information contained or quoted in the article, either express or implied. SMM further disclaims any liability for losses in connection with the information contained or quoted in the article.

For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn. 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
2 hours ago
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
Read More
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
South32 Raises Hermosa Taylor Capex by Over 50%, Delays Production to 2028 H1
On April 30th, South32 raised the development cost estimate for the Taylor deposit at its Hermosa zinc-silver project in Arizona, US, and delayed the timeline. First-stage capital expenditure has increased by more than 50%, from $2.2 billion in the 2024 FS to $3.3 billion. First production has been delayed by one year to H2 FY2028, full production has also been pushed back to FY2031. Cost increase was mainly due to contractor underperformance, slower-than-expected construction productivity, scope changes, inflation, US tariffs and higher input costs. Progress on a key ventilation shaft is the main bottleneck now. But the company also noted that ore reserves at Taylor increased by 52%, mineral resources rose by 10%, extending the expected mine life from 28 years to around 33 years.
2 hours ago
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
Apr 30, 2026 19:11
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
Read More
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs [SMM Analysis]
[Monthly Production Declined: Refined Zinc Faces Dual Pressure from Raw Material Supply and Costs] Overall, refined zinc production release in April and May fell short of expectations, mainly because as ex-China mine disruptions increased and China's ore recovery remained limited, TCs accelerated downward. Imported TCs have already dropped to $39.25/dmt, while China's weekly TCs broke below historical lows to 850 yuan/mt in metal content...
Apr 30, 2026 19:11
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
Apr 30, 2026 17:15
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
Read More
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
Tibet Huayu Reports 2025 Annual Growth in Zinc and Lead-Antimony, Decline in Gold Production
[Tibet Huayu 2025 Annual Report Released] On April 29, Tibet Huayu released its 2025 annual report. In 2025, the company completed zinc concentrates production of 21,300 mt in metal content, up 9.07% YoY, lead-antimony concentrates with silver content production of 19,000 mt in metal content, up 14.56% YoY, and gold concentrates of 1,002 kg, down 46.66% YoY.
Apr 30, 2026 17:15
Chihong Zn&Ge Signs First Anode, Cathode Plate Sales Order - Shanghai Metals Market (SMM)