Power Construction Corporation of China Secures Landmark 500MW/2000MWh Hybrid Energy Storage Project in Xinjiang

Publicado: May 27, 2024 10:29

[500MW/2000MWh! Power Construction Corporation of China Wins the Bid for the Largest Grid-Formed Hybrid Energy Storage Project in China] It is learned from SMM that on May 26th, according to the official microblog of Power Construction Corporation of China, recently, the Fourth Engineering Division of Hydroelectric Power of Power Construction Corporation of China won the bid for the largest grid-formed (independent) hybrid energy storage project in China - Xinhua Wushi 500,000 KW/2,000,000 KWh grid-formed energy storage project.

The project is located in the Aheya Photovoltaic Industrial Park in Wushi County, Aksu City, Xinjiang Uygur Autonomous Region, covering an area of about 456.84 mu. The total installed capacity of the project is 500,000 KW/2,000,000 KWh, including 250,000 KW/1,000,000 KWh lithium iron phosphate battery energy storage and 250,000 KW/1,000,000 KWh all-vanadium redox flow battery energy storage. The energy storage duration is 4 hours, and the whole station can store 2,000,000 KWh of electricity after one charge, which can meet the daily electricity demand of about 300,000 households.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn