Mingshan Energy Storage Power Station in Yiyang City Achieves 35 Million Kilowatt-Hours of New Energy Consumption

Publicado: Dec 18, 2023 15:39

The Mingshan Energy Storage Power Station, with a capacity of 100MW/200MWh in Yiyang City, Hunan Province, has accumulated a total of 35.03 million kilowatt-hours of new energy consumption since it was connected to the grid in April this year. The project is operated by CNNC Hui Energy (Hunan) New Energy Co., Ltd., and is the first energy storage peak-shifting project put into use in Yiyang City.

Since the operation of the project, the Mingshan Energy Storage Power Station has maintained efficient and stable operation, fully absorbing new energy to assist the power grid in peak-shifting and valley-filling, equivalent to reducing coal consumption by 43,051.87 tons and reducing carbon dioxide emissions by 26,622.8 tons.

Declaração sobre a Fonte de Dados: Com exceção das informações publicamente disponíveis, todos os demais dados são processados pela SMM com base em informações publicamente disponíveis, comunicação de mercado e com base no modelo de base de dados interna da SMM. São apenas para referência e não constituem recomendações para a tomada de decisão.

Para quaisquer perguntas ou para obter mais informações, entre em contato: lemonzhao@smm.cn
Para mais informações sobre como aceder aos nossos relatórios de investigação, entre em contato:service.en@smm.cn