On February 6, Chengtun Mining Group said that the high nickel matte project of PT.ChengMach Nickel Indonesia is currently undergoing land leveling, drawing design and other related work.
The project, with a designed annual production capacity of 40,000 mt in Ni content, is expected to be completed and put into operation in the fourth quarter of this year.
![[SMM Analysis] Demanda de compra externa downstream fraca; preços do sal de níquel caíram esta semana](https://imgqn.smm.cn/usercenter/KFwsY20251217171734.jpg)
![[SMM Análise do Meio-Dia do Níquel] Os preços do níquel tiveram uma recuperação significativa em 3 de setembro. Os dados de emprego ADP dos EUA em agosto vieram surpreendentemente fracos, esfriando levemente as apostas em um aumento de juros em setembro.](https://imgqn.smm.cn/usercenter/qLeLR20251217171733.jpg)

