SHANGHAI, Sept. 7 (SMM) - Yunnan Zhenxing Industry Group put 100,000 tonnes of crude lead project into operation recently, SMM understands.
The project employs advanced crude lead smelting technology and mainly uses lead ore as raw materials currently. But with the advancement of technology, the project will make use of various raw materials to ensure low energy consumption and high efficiency.
The old 80,000-tonne capacity of crude lead was closed. Refined lead capacity is left unchanged and refined lead production is expected to be 3,000 tonnes in August.
For news cooperation, please contact us by email: sallyzhang@smm.cn or service.en@smm.cn

![SHFE e LME enfraquecem em conjunto, rompendo o padrão de consolidação; preços do chumbo sob pressão [Resumo da Reunião Matinal de Chumbo da SMM]](https://imgqn.smm.cn/usercenter/PKFMX20251217171721.jpg)
![SHFE e LME rompem abaixo da Banda de Bollinger média; o chumbo da SHFE fecha em queda de 0,53%, recuando para o nível de 16.000 [Relatório Matinal de Chumbo da SMM]](https://imgqn.smm.cn/usercenter/yqTpQ20251217171721.jpeg)
