[Baoshan Iron & Steel Obtains Patent Related to Production Pace Control]

Published: Sep 11, 2026 10:10
September 10 news, the National Intellectual Property Administration information shows that Baoshan Iron & Steel Co., Ltd. applied for a patent named "A Method and Device for HCR Planned Production Pace Control", with grant announcement number CN121232716B and grant announcement date of September 8, 2026. The application publication number is CN121232716A, the application number is CN202410854190.7, the application publication date is September 8, 2026, the application date is June 28, 2024, the inventors are Huang Kewei, Jia Shujin, and Lu Jingrong, the patent agency is Shanghai Huacheng Intellectual Property Agency Co., Ltd., the patent agent is Du Juan, and the classification number is G05B19/418.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Anton Xinmai is expected to have an annual capacity of 1.8 million mt of silicon steel]
23 mins ago
[Anton Xinmai is expected to have an annual capacity of 1.8 million mt of silicon steel]
Read More
[Anton Xinmai is expected to have an annual capacity of 1.8 million mt of silicon steel]
[Anton Xinmai is expected to have an annual capacity of 1.8 million mt of silicon steel]
ArcelorMittal Jinxi New Materials (Changzhou) Co., Ltd. held a brand launch event themed "Moving Toward the New, Embracing the Future Together," officially unveiling its external brand name "AMORNEX Anton Xinmai." The event presented the company's brand image, strategic vision, and project construction achievements in full, marking Anton Xinmai's transition from the engineering construction phase into a new development cycle of coordinated brand operations and market deployment. China is one of the most dynamic regions in the global new energy end-use market. Its complete and efficient new energy industry chain ecosystem provides fertile ground for the R&D iteration, mass production implementation, and scenario validation of new energy soft magnetic materials. Seizing this opportunity of the times, ArcelorMittal joined hands with China Oriental Group to place its core strategic layout for new energy soft magnetic materials in Changzhou, giving birth to Anton Xinmai.
23 mins ago
【Russia’s Eastbound Coal Export Shipments Reach August Record of 10.6 Million Tonnes】
39 mins ago
【Russia’s Eastbound Coal Export Shipments Reach August Record of 10.6 Million Tonnes】
Read More
【Russia’s Eastbound Coal Export Shipments Reach August Record of 10.6 Million Tonnes】
【Russia’s Eastbound Coal Export Shipments Reach August Record of 10.6 Million Tonnes】
Russian Railways reported that eastbound coal shipments for export across its network reached 10.6 million tonnes in August 2026, up 6.1% year on year and the highest level recorded for August. The company attributed the growth to steady demand in Asian markets, particularly China. Total coal loaded for export across its network reached 15.9 million tonnes during the month, up 7.9% year on year, bringing the January–August total to 126.5 million tonnes, up 7.2%.
39 mins ago
【Bangladesh Plans 600MW Plant Using Domestic Coal, Offering Potential Longer-Term Demand Support】
40 mins ago
【Bangladesh Plans 600MW Plant Using Domestic Coal, Offering Potential Longer-Term Demand Support】
Read More
【Bangladesh Plans 600MW Plant Using Domestic Coal, Offering Potential Longer-Term Demand Support】
【Bangladesh Plans 600MW Plant Using Domestic Coal, Offering Potential Longer-Term Demand Support】
Bangladesh’s home minister told parliament that the prime minister had directed the construction of a 600MW coal-fired power plant at Barapukuria using domestic coal. The government is also discussing the resumption of the 1,320MW Payra Phase II coal-fired power project.
40 mins ago