[SMM PV Flash] LONGi Wuhu Base Becomes the First Module Factory in the PV Industry to Receive CMMM Level 4 Certification

Published: Sep 1, 2026 13:26
Every September is China's national "Quality Month." Intelligent manufacturing, as the main direction for driving quality upgrades, is accelerating the new-type industrialization process. Recently, LONGi's Wuhu production site officially passed the Level 4 certification of China's Intelligent Manufacturing Capability Maturity Model (CMMM), becoming the first module factory in the PV industry to receive this certification. This is another important achievement in intelligent manufacturing for the company, following the recognition of LONGi's Jiaxing production site as a "Lighthouse Factory" by the World Economic Forum, and it also serves as a concrete demonstration of intelligent manufacturing delivering results in PV manufacturing.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【SMM Analysis】 US Solar AD/CVD Case Nears Final Ruling, Threatening 6 GW Import Channel from India, Indonesia, and Laos
Sep 11, 2026 18:23
【SMM Analysis】 US Solar AD/CVD Case Nears Final Ruling, Threatening 6 GW Import Channel from India, Indonesia, and Laos
Read More
【SMM Analysis】 US Solar AD/CVD Case Nears Final Ruling, Threatening 6 GW Import Channel from India, Indonesia, and Laos
【SMM Analysis】 US Solar AD/CVD Case Nears Final Ruling, Threatening 6 GW Import Channel from India, Indonesia, and Laos
The US International Trade Commission held its final-phase hearing on September 9 in the antidumping and countervailing duty investigations of crystalline-silicon photovoltaic cells and modules from India, Indonesia and Laos. Under the current USITC schedule, posthearing briefs are due September 16, the Commission plans to vote on October 14, and its final determination and views are scheduled for October 26.
Sep 11, 2026 18:23
【SMM Analysis】Spot Price Floors Move Lower as Deep Off-Peak Hours Expand, Solar-Storage Signals Emerge in Shandong
Sep 11, 2026 17:44
【SMM Analysis】Spot Price Floors Move Lower as Deep Off-Peak Hours Expand, Solar-Storage Signals Emerge in Shandong
Read More
【SMM Analysis】Spot Price Floors Move Lower as Deep Off-Peak Hours Expand, Solar-Storage Signals Emerge in Shandong
【SMM Analysis】Spot Price Floors Move Lower as Deep Off-Peak Hours Expand, Solar-Storage Signals Emerge in Shandong
Shandong has recently moved to adjust its spot-market price floors, industrial and commercial time-of-use tariffs, and operating rules for energy storage co-located with renewable energy stations. Although the three policies target differently, they all address the same challenge.The policies do not mark a return to mandatory storage requirements, but they do increase the downside price exposure of non-mechanism PV volumes and strengthen the need to shift electricity across time.
Sep 11, 2026 17:44
[SMM Analysis] China's stainless futures cost floor starts sliding
Sep 11, 2026 16:12
[SMM Analysis] China's stainless futures cost floor starts sliding
Read More
[SMM Analysis] China's stainless futures cost floor starts sliding
[SMM Analysis] China's stainless futures cost floor starts sliding
SMM Weekly Stainless Steel Futures Review — week of September 7–11, 2026. Absent peak-season demand, a triple-strength US jobs print, and accelerating raw material declines drag the benchmark contract down RMB 200/mt in the week of September 7–11.
Sep 11, 2026 16:12
Every September is China's national "Quality Month." Intelligent manuf - Shanghai Metals Market (SMM)