Lundin Hit by Another Winter Storm, Caserones Full-Year Copper Production Guidance Lowered by 10kt [SMM Analysis]

Published: Aug 19, 2026 15:48 (GMT+8)
[Lundin Hit by Winter Storm Again, Caserones Full-Year Copper Production Guidance Lowered by 10kt] Lundin Mining lowered its 2026 copper production guidance for the Caserones mine by 10kt to 120,000-130,000mt and raised its cash cost guidance, as a second winter storm in Chile's Atacama region again disrupted power supply and production resumption efforts at the mine. The company also cut its full-year consolidated copper production guidance to 300,000-325,000mt. This disruption, combined with weaker overall copper production in Chile, has intensified market attention on the pace of copper ore supply recovery in H2.

       

Canadian miner Lundin Mining announced on August 19 that a second severe winter storm has hit the Atacama region of Chile since August 13, bringing heavy rainfall at lower elevations and unusually heavy snow and strong winds at higher elevations. As a result, the Caserones copper mine experienced another power outage on August 14. Inspections revealed that transmission towers damaged during the first storm were again impacted by strong winds and heavy snow, further delaying the mine’s full production resumption. The company expects to restore full power supply by this weekend, followed by a gradual and safe return to operations.

Due to the cumulative impact of the two extreme weather events, Lundin Mining lowered its 2026 copper production guidance for Caserones from 130,000–140,000 mt Cu to 120,000–130,000 mt Cu, and raised its cash cost guidance from $2.05–$2.25/lb to $2.15–$2.35/lb. At the same time, the company’s 2026 consolidated copper production guidance was cut from 310,000–335,000 mt Cu to 300,000–325,000 mt Cu, while consolidated cash cost guidance was raised from $1.90–$2.10/lb to $1.95–$2.15/lb. The full-year production guidance for the Candelaria copper mine, at 135,000–145,000 mt Cu, remains unchanged.

Chile’s overall copper ore production has shown weakness lately. Cochilco has lowered its 2026 Chilean copper production forecast to 5.27 million mt Cu, down 2.6% YoY, and Caserones once again being affected by extreme weather and cutting its production guidance further heightens market focus on the pace of recovery in Chile’s H2 copper ore supply.

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | NAS Raises Base Price for Type 316 Cold-Rolled Stainless】
2 hours ago
【Flash | NAS Raises Base Price for Type 316 Cold-Rolled Stainless】
Read More
【Flash | NAS Raises Base Price for Type 316 Cold-Rolled Stainless】
【Flash | NAS Raises Base Price for Type 316 Cold-Rolled Stainless】
North American Stainless (NAS), part of Acerinox, said Type 316 cold-rolled products shipped from Oct. 1 would carry a higher base price through a two-point reduction in the functional discount. All active requests for quotation are subject to the adjustment. This is a base-price mechanism change rather than a monthly alloy surcharge.
2 hours ago
【Flash | Industeel Trims October Surcharges Across Mo-Bearing Stainless Grades】
2 hours ago
【Flash | Industeel Trims October Surcharges Across Mo-Bearing Stainless Grades】
Read More
【Flash | Industeel Trims October Surcharges Across Mo-Bearing Stainless Grades】
【Flash | Industeel Trims October Surcharges Across Mo-Bearing Stainless Grades】
Industeel, part of ArcelorMittal had recently updated its October stainless alloy surcharges. 316L/316LN fell 0.9% MoM to €3,684/t, 316LMo 0.7% to €4,115/t, 317L 0.7% to €4,758/t and 904L 1.0% to €6,768/t. 2205+ and 2507 were nearly flat at €3,724/t and €4,389/t, while UR 254 eased to €7,147/t. The schedule excludes energy surcharge.
2 hours ago
Glencore's MARA (Agua Rica–Alumbrera) copper project in Argentina secures RIGI approval
2 hours ago
Glencore's MARA (Agua Rica–Alumbrera) copper project in Argentina secures RIGI approval
Read More
Glencore's MARA (Agua Rica–Alumbrera) copper project in Argentina secures RIGI approval
Glencore's MARA (Agua Rica–Alumbrera) copper project in Argentina secures RIGI approval
Glencore has announced that its Minera Agua Rica-Alumbrera (MARA) project in Catamarca, Argentina has received approval under the Incentive Regime for Large Investments (RIGI), with expected investment of about US$4 billion and long-term fiscal, customs and foreign-exchange stability including a 25% corporate income tax rate. Agua Rica hosts measured and indicated resources of about 1.2 billion tonnes at 0.47% copper, 0.20 g/t gold, 3.40 g/t silver and 0.03% molybdenum. Ore will be processed at the existing Alumbrera plant 35 km away, with potential to average more than 200,000 tpa of copper in concentrate over the first ten years. The Alumbrera restart is brought forward to H2 2027 with nearly 2,000 workers on site. The government expects construction from November 2027 and production from October 2031; the exploitation-phase EIA was submitted last month and approval is not a final construction decision.
2 hours ago