Demand Remains Persistently Weak, Market Moves Sideways at Low Levels [SMM SiMn Weekly Review]

Published: Aug 14, 2026 17:28
As of this Friday, SiMn 6517 (cash) in north China was at 5,700-5,750 yuan/mt, up WoW from last Friday; SiMn 6517 (cash) in south China was at 5,750-5,800 yuan/mt, up WoW from last Friday, and SiMn 6014 (cash) in south China was at 5,350-5,450 yuan/mt, flat WoW from last Friday. Recently, SiMn futures moved sideways in a narrow range with a weak tone, market sentiment was heavily bearish, market prices consolidated at lows, and futures and spot prices were basically in sync.

As of this Friday, SiMn 6517 (cash) in the North China market was at 5,700-5,750 yuan/mt, up from last Friday; SiMn 6517 (cash) in the South China market was at 5,750-5,800 yuan/mt, up from last Friday; and SiMn 6014 (cash) in the South China market was at 5,350-5,450 yuan/mt, flat from last Friday.

Recently, SiMn futures moved sideways in a weak narrow range, market pessimism remained heavy, spot prices consolidated at lows, and futures and spot prices stayed largely in step.

Cost side, ore side: spot manganese ore prices continued to grind lower; electricity price side: electricity prices in Guangxi and Guizhou remained high with no decline expected, Yunnan entered the rainy season and electricity prices were reduced somewhat, and in parts of Inner Mongolia during the low-wind season, power rationing led to slight increases in electricity prices.With multiple factors intertwined, SiMn overall production costs declined somewhat.

Supply side: Inner Mongolia operations remained relatively stable, but most producers reported severe losses at present, with maintenance-related production cuts and load reductions, while capacity release and blast furnace maintenance coexisted. In Ningxia, producer losses deepened and production cuts increased; South China showed divergence. In Yunnan, alloy producers saw relatively notable declines in overall costs due to lower rainy-season electricity prices, and operating rates increased; other parts of South China continued to run at relatively low operating rates, with fewer shipment opportunities and a sluggish market trading atmosphere.Overall industry supply declined, finished product inventories at enterprises remained high, and high destocking pressure weighed on SiMn spot and futures prices in the near term.

Demand side: alloy end-use consumption was sluggish, downstream overall purchasing sentiment remained weak, and steel mills and traders were cautious about restocking, making it difficult to provide an effective boost to the SiMn market in the near term. Steel mill tenders continued to come in. HBIS set its August 2026 SiMn price at 5,880 yuan/mt, only 80 yuan/mtu above the initial inquiry of 5,800 yuan/mt, and this represented a notable MoM decline from the July price of 5,950 yuan/mt, with significant downward pricing pressure. Procurement volume was 16,600 mt. This round of steel mill tender pricing did little to boost the market, and market shipment sentiment remained cautious.

Overall, current demand can hardly provide an effective boost to prices, and producers are broadly in a loss-making position. Against a loose supply-demand backdrop, SiMn is expected to continue consolidating on a subdued note in the near term. The market remains dominated by wait-and-see and relatively pessimistic sentiment. Going forward, it remains necessary to monitor SiMn supply-demand changes and fluctuations in futures.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Stronger Profits, Yet Limited Supply Elasticity: H1 2026 Americas Moly Mine Review
17 hours ago
[SMM Analysis] Stronger Profits, Yet Limited Supply Elasticity: H1 2026 Americas Moly Mine Review
Read More
[SMM Analysis] Stronger Profits, Yet Limited Supply Elasticity: H1 2026 Americas Moly Mine Review
[SMM Analysis] Stronger Profits, Yet Limited Supply Elasticity: H1 2026 Americas Moly Mine Review
In H1 2026, Americas moly supply divergence deepened. Despite stronger mining profits, overall output failed to rebound. While H2 may see recoveries at select large mines, supply elasticity remains constrained. Which operations are dragging on supply, and where will incremental growth emerge? SMM data reveals a market entering a new phase of "stronger margins, diverging production, and concentrated incremental gains."...
17 hours ago
[SMM Chromium Week Review] Chrome Ore Flows Rebound as China Port Stocks Build, Zimbabwe Eyes Ferrochrome Capacity
21 hours ago
[SMM Chromium Week Review] Chrome Ore Flows Rebound as China Port Stocks Build, Zimbabwe Eyes Ferrochrome Capacity
Read More
[SMM Chromium Week Review] Chrome Ore Flows Rebound as China Port Stocks Build, Zimbabwe Eyes Ferrochrome Capacity
[SMM Chromium Week Review] Chrome Ore Flows Rebound as China Port Stocks Build, Zimbabwe Eyes Ferrochrome Capacity
September 11, 2026.
21 hours ago
[SMM Chromium Flash] Tharisa's Underground Transition at Its Chrome-PGM Flagship Mine Remains on Track
21 hours ago
[SMM Chromium Flash] Tharisa's Underground Transition at Its Chrome-PGM Flagship Mine Remains on Track
Read More
[SMM Chromium Flash] Tharisa's Underground Transition at Its Chrome-PGM Flagship Mine Remains on Track
[SMM Chromium Flash] Tharisa's Underground Transition at Its Chrome-PGM Flagship Mine Remains on Track
Tharisa confirmed its transition to underground mining at its flagship Tharisa Mine, on the southwestern limb of South Africa's Bushveld Complex, remains on time and within budget, running in parallel with the Karo Platinum Project's construction financing in Zimbabwe. Development of the Apollo underground complex, which commenced in March 2026, is progressing toward first run-of-mine ore in the current quarter, with steady-state production of 255,000 mt per month targeted by the third quarter of calendar year 2029. The Orion complex is expected to follow, targeting first ore in financial year 2031 and steady-state production by the third quarter of calendar year 2033. Together, Tharisa said the two underground complexes are expected to extend mining at the Tharisa Mine, which co-produces chrome concentrate alongside PGMs from the same orebody, for more than 60 years beyond depletion of the current open pit. The underground project is fully funded through development loans from Absa and Standard Bank and an asset-based revolving facility from Nedbank, funding that sits separately from the US$300 million Nordic bond raised this week for Karo. The company did not break out what share of Apollo or Orion's future run-of-mine ore output will be chrome-bearing material versus PGM-bearing material, leaving the underground transition's specific impact on Tharisa's chrome concentrate volumes still to be clarified as the two complexes ramp up toward steady state.
21 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here
Demand Remains Persistently Weak, Market Moves Sideways at Low Levels [SMM SiMn Weekly Review] - Shanghai Metals Market (SMM)