Rio2’s Condestable Produces 9.3 Mlb of Copper in Q2, Keeps 2026 Guidance

Published: Aug 14, 2026 13:13
Rio2 Limited’s Condestable mine in Peru processed more than 700,000 tonnes of ore in Q2 2026, producing 9.30 million lb of copper, 4,451 oz of gold and 74,374 oz of silver contained in concentrate. Average ore grades were 0.66% copper, 0.24 g/t gold and 3.88 g/t silver. Copper grades came in below plan due to higher internal dilution in certain mining areas, particularly in June, while copper recoveries remained slightly below expectations because of higher oxide content near the base of oxidation. Condestable maintained its February–December 2026 payable copper-equivalent production guidance at 21,500–23,500 tonnes. Rio2 is also advancing ore-sorting trials, a tailings filtration plant and a preliminary assessment to expand processing capacity to 10,000 tpd, with pilot ore-sorting equipment expected to arrive before November 2026. Current reserves and resources support an estimated 14-year mine life.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Copper Cathode Rod Producers See 1% WoW Increase in Operating Rates Amid Weak Demand
10 mins ago
Copper Cathode Rod Producers See 1% WoW Increase in Operating Rates Amid Weak Demand
Read More
Copper Cathode Rod Producers See 1% WoW Increase in Operating Rates Amid Weak Demand
Copper Cathode Rod Producers See 1% WoW Increase in Operating Rates Amid Weak Demand
[SMM Copper Cathode Rod Flash] This week, the operating rate of copper cathode rod producers increased by 1 percentage point WoW. Some post-maintenance production resumptions supported a slight recovery in operating rates, but the market was in the off-season for consumption, and copper prices consolidated at highs, suppressing purchase willingness. Downstream wait-and-see sentiment was strong; overall order performance was weak, and end-user rigid demand for wire and cable and enamelled wire was insufficient.
10 mins ago
Wire and Cable Operating Rates Continued to Pull Back This Week; Weak Demand to Keep Next Week’s Operating Rates Trending Lower [SMM Wire and Cable Market Weekly Review]
41 mins ago
Wire and Cable Operating Rates Continued to Pull Back This Week; Weak Demand to Keep Next Week’s Operating Rates Trending Lower [SMM Wire and Cable Market Weekly Review]
Read More
Wire and Cable Operating Rates Continued to Pull Back This Week; Weak Demand to Keep Next Week’s Operating Rates Trending Lower [SMM Wire and Cable Market Weekly Review]
Wire and Cable Operating Rates Continued to Pull Back This Week; Weak Demand to Keep Next Week’s Operating Rates Trending Lower [SMM Wire and Cable Market Weekly Review]
41 mins ago
[SMM Analysis] High Copper Prices Weigh on Demand as Payable for Copper Scrap Diverge
44 mins ago
[SMM Analysis] High Copper Prices Weigh on Demand as Payable for Copper Scrap Diverge
Read More
[SMM Analysis] High Copper Prices Weigh on Demand as Payable for Copper Scrap Diverge
[SMM Analysis] High Copper Prices Weigh on Demand as Payable for Copper Scrap Diverge
[SMM Analysis: High Copper Prices Weigh on Demand as Payable for Copper Scrap Diverge]No.1 and No.2 copper materials came under greater pressure. Smelter maintenance, seasonal weakness in downstream demand and historically high copper prices led buyers to reduce procurement volumes and focus mainly on immediate production needs. By mid-August, No.1 copper payabilities had eased to around 96%-97%, while US No.2 copper materials traded near 95.5% and European No.2 copper materials around 94.5%-95%
44 mins ago
Rio2 Limited’s Condestable mine in Peru processed more than 700,000 to - Shanghai Metals Market (SMM)