August Gufen Flake Graphite and Titanium Industry Graphite Block Open Tender Procurement Announcement

Published: Aug 4, 2026 11:27

1. Tender Conditions

The tender project for the open tender procurement of August stock flake graphite and titanium graphite block (PGWZMYHGZHD260803308242) has the bid inviter as Pangang Group Materials and Trade Co., Ltd. Funding for the tender project comes from self-raised funds. The project has satisfied the tender conditions, and a public tender is hereby conducted.

2. Project Overview and Tender Scope

2.1 Project Name: Open Tender Procurement of August Stock Flake Graphite and Titanium Graphite Block

2.2 If the tender fails, other procurement methods will be adopted: transfer to negotiated procurement

2.3 For the tender content, scope, and scale of this project, please refer to the attachment "Material List Attachment.pdf."

3. Bidder Qualification Requirements

3.1 Consortium bidding is not permitted in this tender.

3.2 This tender requires the bidder to have the following qualification requirements:

See attachment (if needed)

3.3 This tender requires the bidder to meet the following registered capital requirements:

Production-type registered capital: 200.0 (10,000 yuan) and above

3.4 This tender requires the bidder to have the following performance requirements:

When submitting the bid, the bidder must provide performance proof for similar products from January 1, 2023 to the bid deadline (scanned copy of VAT special invoice; those without uploaded Pangang supply performance will be considered as new suppliers).

3.5 This tender requires the bidder to have the following capability requirements, financial requirements, and other requirements:

Financial Requirements: See attachment (if needed)

Capability Requirements: Provide valid enterprise qualification certificates: scanned copy of business license original or duplicate

Other Requirements: See attachment (if needed)

3.6 For projects that must be tendered according to law, bids from dishonest debtors are invalid.

4. Acquisition of Tender Documents

4.1 All those intending to participate in the bidding, please log in to the Ansteel Smart Tender and Bid Platform http://bid.ansteel.cn to download the electronic tender documents from 08:45 on August 4, 2026 to 08:45 on August 25, 2026 (Beijing time, the same hereinafter).

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Tender Launched for Photovoltaic-Charging Station in Shaoxing, Zhejiang; 7.6M Yuan Budget for Heavy-Duty Trucks
2 hours ago
Tender Launched for Photovoltaic-Charging Station in Shaoxing, Zhejiang; 7.6M Yuan Budget for Heavy-Duty Trucks
Read More
Tender Launched for Photovoltaic-Charging Station in Shaoxing, Zhejiang; 7.6M Yuan Budget for Heavy-Duty Trucks
Tender Launched for Photovoltaic-Charging Station in Shaoxing, Zhejiang; 7.6M Yuan Budget for Heavy-Duty Trucks
On August 3, a tender was launched for a photovoltaic-storage-charging heavy-duty truck ultra-fast charging station in Shaoxing, Zhejiang. The project is located west of Dinggang Straight Street, Mashan Subdistrict, Yuecheng District, Shaoxing City, next to the existing Shaoxing Motor Vehicle Inspection Station. The tender has a price limit of 7.6 million yuan. The procurement scope includes: 2 units of 720KW split DC chargers, 24 single-gun DC charging terminals, 2 dual-gun DC charging terminals, an EMS energy management system, 204 photovoltaic panels, 3 grid-tied inverters, a 560-square-meter photovoltaic canopy, and 3 units of 125kW/261kWh liquid-cooled energy storage systems. The tender also specifies reference brands for the equipment. For the energy storage system, it explicitly requires brands such as Zhejiang Xinghua, Zhejiang Haide New Energy, Hithium Energy Storage, EVE, and CATL.
2 hours ago
Shida Shenghua to Invest in Three Major New Energy Projects, Including Lithium Salts and Electrolytes
2 hours ago
Shida Shenghua to Invest in Three Major New Energy Projects, Including Lithium Salts and Electrolytes
Read More
Shida Shenghua to Invest in Three Major New Energy Projects, Including Lithium Salts and Electrolytes
Shida Shenghua to Invest in Three Major New Energy Projects, Including Lithium Salts and Electrolytes
On the evening of August 3, Shida Shenghua New Materials Group Co., Ltd. disclosed that its wholly-owned subsidiary plans to invest in the construction of three major projects: a 230,000 tons/year liquid lithium salt project, a 200,000 tons/year electrolyte project, and a 12,000 tons/year additive project. The total investment for the three projects amounts to approximately 2.805 billion yuan. According to the announcement, the 230,000 tons/year liquid lithium salt project will be implemented by Dongying Shida Shenghua New Energy Co., Ltd., with an approved investment of approximately 1.797 billion yuan and a construction period of 24 months. Upon reaching full capacity, the project is expected to produce 150,000 tons/year of DMC liquid lithium salt and 80,000 tons/year of EMC liquid lithium salt annually, along with by-products including hydrochloric acid, dimethyl carbonate, and ethyl methyl carbonate. The project is projected to generate annual operating revenue of approximately 6.086 billion yuan and net profit of about 1.523 billion yuan.
2 hours ago
Global Lithium Receives Mining Development Approval for Manna Lithium Project, Advancing Toward Q4 2026 FID
2 hours ago
Global Lithium Receives Mining Development Approval for Manna Lithium Project, Advancing Toward Q4 2026 FID
Read More
Global Lithium Receives Mining Development Approval for Manna Lithium Project, Advancing Toward Q4 2026 FID
Global Lithium Receives Mining Development Approval for Manna Lithium Project, Advancing Toward Q4 2026 FID
On August 4, Global Lithium (ASX: GL1) announced that its Manna Lithium Project in Western Australia has received approval for its Mining Development and Closure Proposal (MDCP) from the Western Australian Department of Mines, Petroleum and Exploration. The approval was secured slightly ahead of the company’s internal schedule, marking another key milestone in the project’s development. The approved MDCP authorises the commencement of early works and critical site infrastructure, including the development of multiple open pits, an accommodation village, and associated mining facilities. According to the company, the approval further de-risks Manna’s accelerated development pathway and strengthens its integrated Manna–Nova development strategy. Global Lithium is targeting a Final Investment Decision (FID) in the fourth quarter of 2026, with first Direct Shipping Ore (DSO) expected in the second quarter of 2027, followed by first production of SC5.5 spodumene concentrate in mid-2027. Managing Director Dr. Dianmin Chen said the approval represents an important regulatory milestone that further accelerates the company’s path toward production and supports its ambition to become Australia’s next lithium producer.
2 hours ago
August Gufen Flake Graphite and Titanium Industry Graphite Block Open Tender Procurement Announcement - Shanghai Metals Market (SMM)