Tender for Wires and Cables for Electrical Engineering of the 2026 Old Community Renovation Project in Tiedong District, Anshan City by Electrical Installation Team 1 of the Electromechanical Company

Published: Jul 31, 2026 20:14

1. Bidding Conditions

This bidding project, Electromechanical Company Electric Installation Team 1, 2026 Old Residential Community Renovation Project in Tiedong District, Anshan City – Electric Engineering Wires and Cables (AGGZZBHGZHD260731307933), is initiated by the bid inviter, Ansteel Group Engineering Technology Development Co., Ltd., with self-raised funds. The project has met the conditions for public bidding, and public bidding is now conducted.

2. Project Overview and Bidding Scope

2.1 Project Name: Electromechanical Company Electric Installation Team 1, 2026 Old Residential Community Renovation Project in Tiedong District, Anshan City – Electric Engineering Wires and Cables

2.2 Conversion to Other Procurement Methods upon Bidding Failure: Not applicable

2.3 For the bidding content, scope, and scale, please refer to the attached Bill of Materials Appendix.pdf.

3. Bidder Qualification Requirements

3.1 Joint bidding is not permitted for this bidding.

3.2 The bidder shall meet the following qualification requirements:

Please refer to the appendix (if any)

3.3 The bidder shall meet the following registered capital requirements:

Production-type registered capital: 100 million yuan or above

3.4 The bidder shall meet the following performance requirements:

One copy of scanned sales contracts and corresponding invoices for cables, 2025-2026

3.5 The bidder shall meet the following requirements for capability, finance, and others:

Financial requirements: Please refer to the appendix (if any)

Capability requirements: Provide the Industrial Product Production License (Cable Category)

Other requirements: Please refer to the appendix (if any)

3.6 For projects subject to mandatory bidding by law, bids from dishonest persons subject to enforcement are invalid.

4. Obtaining the Bidding Documents

4.1 Any bidder who intends to participate in the bidding shall log into the Ansteel Smart Bidding Platform at http://bid.ansteel.cn to download the electronic bidding documents from 17:00, July 31, 2026 to 08:00, August 25, 2026 (Beijing time, the same hereinafter).

Click to view bidding details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
15 mins ago
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
Read More
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
Today, HRC futures prices strengthened significantly, with the most-traded contract closing at 3,340, up 1.49% intraday. In the spot market, prices increased by 30-50 yuan/mt overall, while intraday transactions were average; as futures rallied too fast, most traders adopted a wait-and-see attitude, and downstream buyers showed relatively low acceptance of high prices. On the fundamentals side, from the end of August to September, maintenance schedules for hot rolling have increased notably. This week, the impact from maintenance for hot rolling is expected to continue increasing, with production edging down. On the demand side, downstream buyers' willingness for concentrated purchases was not high, with most still in off-season sentiment, making it difficult to see significant improvement; in the short term, the pattern of weak supply and demand persists. However, on the cost side, with growth in hot metal, coupled with supply tightening due to Mongolian and Shanxi coal, and the expected first-round increase of coke, coking coal and coke led the gains, boosting market sentiment and driving finished steel prices higher. In summary, short-term HRC prices are expected to follow costs and hold up well.
15 mins ago
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
37 mins ago
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
Read More
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
[Steel Billet Price Adjustment] On August 24, Tangshan Qian'an plain square billet resources ex-factory, tax included, raised by 10, reported at 3,000 (yuan/mt). [SMM Steel]
37 mins ago
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
49 mins ago
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
Read More
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
49 mins ago