【Whitehaven Output Reaches Guidance Ceiling as Australian Seaborne Met Coal Supply Recovers】

Published: Jul 31, 2026 10:32
Whitehaven Coal reported FY2026 ROM production of 40.3 Mt, up 3% year on year and at the top end of its production guidance, while equity sales reached 26.0 Mt. June quarter ROM production totaled 10.7 Mt, up 13% quarter on quarter, with Queensland (QLD) operations—the company's key metallurgical coal assets—rising 41% QoQ to 5.7 Mt, largely recovering from weather-related disruptions in the previous quarter. The recovery in Queensland output is expected to lift Australian seaborne metallurgical coal exports, easing earlier supply concerns. Against a backdrop of weak global steel demand and cautious steel mill procurement, improved supply is likely to reduce competition for spot cargoes and place moderate downward pressure on international seaborne metallurgical coal prices.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
13 mins ago
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
Read More
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
Today, HRC futures prices strengthened significantly, with the most-traded contract closing at 3,340, up 1.49% intraday. In the spot market, prices increased by 30-50 yuan/mt overall, while intraday transactions were average; as futures rallied too fast, most traders adopted a wait-and-see attitude, and downstream buyers showed relatively low acceptance of high prices. On the fundamentals side, from the end of August to September, maintenance schedules for hot rolling have increased notably. This week, the impact from maintenance for hot rolling is expected to continue increasing, with production edging down. On the demand side, downstream buyers' willingness for concentrated purchases was not high, with most still in off-season sentiment, making it difficult to see significant improvement; in the short term, the pattern of weak supply and demand persists. However, on the cost side, with growth in hot metal, coupled with supply tightening due to Mongolian and Shanxi coal, and the expected first-round increase of coke, coking coal and coke led the gains, boosting market sentiment and driving finished steel prices higher. In summary, short-term HRC prices are expected to follow costs and hold up well.
13 mins ago
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
35 mins ago
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
Read More
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
[Steel Billet Price Adjustment] On August 24, Tangshan Qian'an plain square billet resources ex-factory, tax included, raised by 10, reported at 3,000 (yuan/mt). [SMM Steel]
35 mins ago
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
47 mins ago
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
Read More
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
47 mins ago