PV frame demand underpins steady operations; short-term aluminum prices consolidate on a strong note [SMM Analysis]

Published: Jul 30, 2026 22:11 (GMT+8)

SMM July 30:

PV Aluminum Extrusion: This week, according to feedback from PV frame enterprises in the survey sample, industry operating rates remained stable overall. According to SMM, China’s module scheduled production was ~38.5 GW in July, and is expected to edge up MoM to 39.3 GW in August. Underpinned by stable-to-rising demand from downstream module production schedules, PV frame enterprises’ operating rates are expected to hold steady in the near term, with leading PV frame enterprises with long-term contract advantages maintaining high operating rates.

Raw Material Prices: During the period (July 27–30, 2026), the SMM A00 weekly average price was 23,357.5 yuan/mt, up 0.8% from the previous week’s average. Overall, the continuous rise in the proportion of liquid aluminum in China, the persistent geopolitical risk premium in the Middle East, combined with sustained destocking of domestic aluminum ingots, jointly supported aluminum prices, visibly enhancing near-term market confidence. However, the continuous additions of forward aluminum capacity outside China, weak traditional end-use demand in China, together with ongoing fluctuations in expectations for US Fed interest rate hikes and uncertainty in the Middle East geopolitical situation, still pose certain pressure on aluminum price upside. In the near term, aluminum prices maintained a consolidation pattern on a strong note. Next week, the most-traded SHFE aluminum contract is expected to move in a range of 23,000–24,150 yuan/mt, and LME aluminum in a range of $3,100–3,250/mt.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

Images in this article contain AI-translated captions for reference only.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Module Deliveries Support Near-Term Frame Demand; Aluminum Prices Under Pressure Amid Post-Holiday Inventory Buildup and Demand Weakening Risks [SMM Analysis]
9 hours ago
Module Deliveries Support Near-Term Frame Demand; Aluminum Prices Under Pressure Amid Post-Holiday Inventory Buildup and Demand Weakening Risks [SMM Analysis]
Read More
Module Deliveries Support Near-Term Frame Demand; Aluminum Prices Under Pressure Amid Post-Holiday Inventory Buildup and Demand Weakening Risks [SMM Analysis]
Module Deliveries Support Near-Term Frame Demand; Aluminum Prices Under Pressure Amid Post-Holiday Inventory Buildup and Demand Weakening Risks [SMM Analysis]
9 hours ago
[SMM PV Flash] China Resources Yunfu Xianghai Optoelectronics distributed PV power generation project successfully connected to grid, with an estimated annual power generation of 7.32 million kWh
10 hours ago
[SMM PV Flash] China Resources Yunfu Xianghai Optoelectronics distributed PV power generation project successfully connected to grid, with an estimated annual power generation of 7.32 million kWh
Read More
[SMM PV Flash] China Resources Yunfu Xianghai Optoelectronics distributed PV power generation project successfully connected to grid, with an estimated annual power generation of 7.32 million kWh
[SMM PV Flash] China Resources Yunfu Xianghai Optoelectronics distributed PV power generation project successfully connected to grid, with an estimated annual power generation of 7.32 million kWh
On September 24, the China Resources Power Yunfu Xianghai Optoelectronics distributed PV project was successfully connected to the grid. It is the largest single distributed PV project of China Resources Power Yunfu Company to date and the seventh integrated energy project completed and put into operation by the company. The project has a total installed capacity of 5.988 MW, adopts the "self-generation for self-use with surplus power fed to the grid" operating model, and is connected to the power grid at a 10 kV voltage level. Leveraging rooftop resources within the plant area, the project generates green power that is consumed on-site, with surplus electricity transmitted to the public grid, achieving efficient energy utilization. Once operational, the project is expected to generate 7.32 million kWh of electricity annually, saving approximately 2,233 mt of standard coal and reducing carbon dioxide emissions by about 6,282 mt each year, delivering significant ecological and emission-reduction benefits. The successful grid connection of the project has further enriched the regional supply of green energy and supported local efforts to optimize the energy consumption structure. China Resources Power Yunfu Company will continue to expand integrated energy business scenarios, accelerate the implementation of diverse green projects, deepen cooperation with key energy-consuming enterprises, and continuously inject green momentum into the high-quality development of the regional economy.
10 hours ago
[SMM PV News] Datang Baliu PV Project Achieves Full-Capacity Grid Connection
10 hours ago
[SMM PV News] Datang Baliu PV Project Achieves Full-Capacity Grid Connection
Read More
[SMM PV News] Datang Baliu PV Project Achieves Full-Capacity Grid Connection
[SMM PV News] Datang Baliu PV Project Achieves Full-Capacity Grid Connection
On September 21, the Balu PV power generation project of the Central Yunnan New Energy Business Division of Datang Yunnan Company successfully achieved full-capacity grid connection. The project is located in Nasu Village, Mojiang County, Pu'er City, with a rated installed capacity of 30 MW, a capacity ratio of 1.365, 9 PV arrays, a newly built 35 kV switching station, and a total land area of 814.98 mu. After the project is put into operation, the average annual power generation is expected to reach 54.3161 million kWh, with 1,322.87 effective utilization hours. It can save approximately 15,900 mt of standard coal and reduce carbon dioxide emissions by approximately 43,500 mt each year, delivering significant energy-saving and emission-reduction benefits. The project adopts a "power generation above, tea planting below" tea-PV complementary development model, creating a favorable pattern of coordinated development between new energy and the local tea industry, with mutual benefits for both ecological and economic outcomes. Since the start of construction, the business division has focused closely on the goal of building a "gene project," making every effort to ensure safety, monitor quality, accelerate progress, and strengthen Party building. By working backward from the completion date and managing the schedule on a wall chart, the division has made every effort to overcome the three major difficulties of communication and coordination, permit processing, and traffic control, laying a solid foundation for the smooth commissioning of the project.
10 hours ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here