Silver Storm Mining has completed the first post-restart concentrate shipment from its wholly owned La Parrilla Silver Mine Complex in Durango State, Mexico. Produced through the sulphide processing circuit, the initial cargo comprised 105 dry tonnes of lead-silver concentrate and 70 dry tonnes of zinc concentrate, delivered under the company’s previously announced offtake prepayment agreement.
La Parrilla operated from 2005 until September 2019 before being placed on care and maintenance. Silver Storm said the operation has now moved into a revenue-generating phase and is positioned for ongoing concentrate shipments. The company plans to raise sulphide processing throughput toward its 1,250-tonne-per-day nameplate capacity; actual throughput, zinc concentrate grade and contained-zinc output have not yet been disclosed.
![Strong macro wait-and-see sentiment intertwined with mediocre spot trades, the most-traded SHFE tin contract moves sideways [SMM Tin Midday Review].](https://imgqn.smm.cn/usercenter/cUElw20251217171752.jpg)
![[SMM Flash] Russia Lifts Rail Transit Ban on Kazakh Sulfur Exports](https://imgqn.smm.cn/usercenter/gCNEi20251217171715.jpeg)

