Operation and Maintenance 260713 Large Electrical Cable Procurement Tender Announcement

Published: Jul 23, 2026 15:03

1. Procurement Conditions

This procurement project, Operations and Maintenance 260713 Large Electrical Cable Procurement (AGSYYWHGXHD260720305145), is initiated by Angang Industrial Group (Anshan) Equipment Operation & Maintenance Co., Ltd., with funds sourced from self-financing. The project has met the necessary procurement conditions and is now proceeding with an open inquiry.

2. Project Overview and Procurement Scope

2.1 Project name: Operations and Maintenance 260713 Large Electrical Cable Procurement

2.2 If the procurement fails, it will not be converted to another procurement method.

2.3 For details on the procurement content, scope, and scale of this project, please refer to the attachment Bill of Materials Attachment.pdf.

3. Bidder Qualification Requirements

3.1 Consortium bidding is not permitted for this procurement.

3.2 Bidders must meet the following qualification requirements for this procurement:

(1) Business license

3.3 Bidders must meet the following registered capital requirement:

Registered capital: 100 (10,000 yuan) or above

3.4 Bidders must meet the following performance requirements:

Provide at least one value-added tax invoice for wire and cable products issued from July 2023 to the present, along with the corresponding scanned contract.

3.5 Bidders must meet the following capability, financial, and other requirements:

Financial requirements: Refer to the attachment (if applicable)

Capability requirements: Refer to the attachment (if applicable)

Other requirements: Refer to the attachment (if applicable)

3.6 For projects where bidding is mandated by law, bids from dishonest persons subject to enforcement are invalid.

4. Obtaining the Procurement Documents

4.1 All those intending to participate in the bid should log in to the Ansteel Smart Bidding Platform at http://bid.ansteel.cn between 17:00, July 21, 2026 and 08:00, August 6, 2026 (Beijing time, the same hereinafter) to download the electronic procurement documents.

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
13 mins ago
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
Read More
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
[SMM Sheets & Plates Daily Comment] HRC futures surged alongside costs, with production still expected to edge down
Today, HRC futures prices strengthened significantly, with the most-traded contract closing at 3,340, up 1.49% intraday. In the spot market, prices increased by 30-50 yuan/mt overall, while intraday transactions were average; as futures rallied too fast, most traders adopted a wait-and-see attitude, and downstream buyers showed relatively low acceptance of high prices. On the fundamentals side, from the end of August to September, maintenance schedules for hot rolling have increased notably. This week, the impact from maintenance for hot rolling is expected to continue increasing, with production edging down. On the demand side, downstream buyers' willingness for concentrated purchases was not high, with most still in off-season sentiment, making it difficult to see significant improvement; in the short term, the pattern of weak supply and demand persists. However, on the cost side, with growth in hot metal, coupled with supply tightening due to Mongolian and Shanxi coal, and the expected first-round increase of coke, coking coal and coke led the gains, boosting market sentiment and driving finished steel prices higher. In summary, short-term HRC prices are expected to follow costs and hold up well.
13 mins ago
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
35 mins ago
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
Read More
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
Tangshan Qian'an Raises Steel Billet Price by 10 to 3,000 Yuan/mt on August 24 [SMM Steel]
[Steel Billet Price Adjustment] On August 24, Tangshan Qian'an plain square billet resources ex-factory, tax included, raised by 10, reported at 3,000 (yuan/mt). [SMM Steel]
35 mins ago
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
48 mins ago
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
Read More
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
Heavy Machinery Design Institute Forging Plant New No.5 High-Temperature Electric Furnace Power Supply System Project Cable Procurement Tender Notice
48 mins ago