Procurement Tender Announcement for Electrical Cables of Project 260713

Published: Jul 23, 2026 14:59

1. Procurement Conditions

This procurement project, Engineering 260713 Electrical Cable Procurement (AGJJGSHGXHD260720305137), is tendered by Ansteel Engineering Production and Operations (Anshan) Co., Ltd. The project funds are self-raised, and the project has met the conditions for procurement. An open inquiry is now conducted.

2. Project Overview and Procurement Scope

2.1 Project Name: Engineering 260713 Electrical Cable Procurement

2.2 If this procurement fails, will it transfer to another procurement method: No

2.3 For details of the procurement content, scope, and scale of this project, please refer to the attached Bill of Materials Attachment.pdf.

3. Bidder Qualification Requirements

3.1 Consortium bidding is not allowed for this procurement.

3.2 For this procurement, bidders must meet the following qualification requirement:

(1) Business License

3.3 For this procurement, bidders must meet the following registered capital requirement:

Registered capital: 1,000,000 yuan or above

3.4 For this procurement, bidders must meet the following performance requirement:

Provide at least one scanned copy of a special value-added tax (VAT) invoice for wire and cable products issued from July 2023 to the present, along with the corresponding contract.

3.5 For this procurement, bidders must meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: Refer to the attachments (if required)

Capability requirements: Refer to the attachments (if required)

Other requirements: Refer to the attachments (if required)

3.6 For projects that must be tendered according to law, bids from dishonest persons subject to enforcement are invalid.

4. Acquisition of Procurement Documents

4.1 Anyone intending to participate in the bid should log in to the Ansteel Smart Tendering and Bidding Platform at http://bid.ansteel.cn to download the electronic procurement documents from 17:00 on July 21, 2026 to 08:00 on August 6, 2026 (Beijing time, the same hereinafter).

Click to view tender details:

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Steel]
40 mins ago
[SMM Steel]
Read More
[SMM Steel]
[SMM Steel]
[Sheets & Plates] Today, export prices of hot-rolled coil (HRC) and other sheets & plates rose $1-2/mt DoD, with HRC transaction prices at $487-492/mt. China’s futures market rose today, and traders reported that transactions were not as good as in the previous few days, while order intake at steel mills also fell short of expectations.
40 mins ago
(SMM Analysis) JSW Steel's Expansion Pipeline Gathers Pace as India Demand Offsets Import Pressures
40 mins ago
(SMM Analysis) JSW Steel's Expansion Pipeline Gathers Pace as India Demand Offsets Import Pressures
Read More
(SMM Analysis) JSW Steel's Expansion Pipeline Gathers Pace as India Demand Offsets Import Pressures
(SMM Analysis) JSW Steel's Expansion Pipeline Gathers Pace as India Demand Offsets Import Pressures
JSW Steel expects production and sales to strengthen from Q2 FY27 as the expanded Blast Furnace-3 at Vijayanagar ramps up, while reaffirming an aggressive capacity expansion pipeline spanning Dolvi, Odisha, Utkal and Kadapa. Despite the planned BF-3 shutdown, the company reported record first-quarter steel sales of 6.25 million tonnes, supported by resilient domestic demand and a 46% year-on-year increase in exports.
40 mins ago
[ArcelorMittal Spain Signs Record Energy-Savings Deal]
49 mins ago
[ArcelorMittal Spain Signs Record Energy-Savings Deal]
Read More
[ArcelorMittal Spain Signs Record Energy-Savings Deal]
[ArcelorMittal Spain Signs Record Energy-Savings Deal]
ArcelorMittal Spain and energy company Moeve signed an Energy Savings Certificate agreement covering 2.1 TWh of annual savings, the largest such transaction in Spain. The deal supports decarbonization at the Gijón plant, including a new electric arc furnace, and is expected to cut more than 1 million tonnes of CO₂ emissions annually.
49 mins ago
Procurement Tender Announcement for Electrical Cables of Project 260713 - Shanghai Metals Market (SMM)