Industry-Wide Supply Decline, Limited Spot Price Gains [SMM SiMn Weekly Review]

Published: Jul 17, 2026 17:37 (GMT+8)
As of this Friday, SiMn 6517 (cash) in north China was at 5,750-5,800 yuan/mt, up WoW; SiMn 6517 (cash) in south China was at 5,800-5,850 yuan/mt, up WoW from last Friday, while SiMn 6014 (cash) in south China was at 5,350-5,400 yuan/mt, down WoW. Recently, SiMn futures moved sideways in a weak trend. A strong wait-and-see sentiment prevailed, with spot prices edging up slightly, but futures could not drive spot prices significantly higher.

As of this Friday, SiMn 6517 (cash) in north China stood at 5,750-5,800 yuan/mt, with prices up WoW. In south China, SiMn 6517 (cash) was at 5,800-5,850 yuan/mt, up WoW, while SiMn 6014 (cash) was at 5,350-5,400 yuan/mt, down WoW.

Recently, SiMn futures consolidated on a subdued note, and the market saw a strong wait-and-see sentiment. Spot prices edged up, but futures struggled to drive spot cargo significantly higher.

Cost side: Ore side, spot manganese ore prices stayed high. Electricity side, electricity prices in Guangxi and Guizhou remained elevated after being raised, with no signs of coming down. Yunnan is about to enter the rainy season, with electricity prices about to be lowered. Parts of Inner Mongolia experienced power rationing during the light-wind season, and electricity prices may be raised. Amid these intersecting factors, SiMn total production costs stayed high, putting smelters under significant pressure.

Supply side: Operations in Inner Mongolia remained relatively stable, but most producers reported severe losses amid maintenance and load reductions, with capacity release and BF maintenance occurring simultaneously. Ningxia producers deepened production cuts. South China alloy producers overall operated at low rates, with few shipment opportunities and a sluggish trading atmosphere. Industry-wide supply declined, while finished product inventories at enterprises stayed high. High destocking pressure weighed on SiMn spot and futures prices in the near term.

Demand side: End-use consumption of alloys was sluggish. Overall downstream purchasing sentiment remained weak, and steel mills and traders stayed cautious on restocking, offering limited near-term support to the SiMn market. Steel mill tenders rolled in one after another. HBIS’s July 2026 SiMn purchase volume was 15,400 mt, flat MoM. Its initial inquiry stood at 5,900 yuan/mt, with a final price set at 5,950 yuan/mt, offering limited boost to the market, and shipment sentiment remained subdued.

Under a loose supply-demand balance, SiMn is expected to consolidate on a subdued note in the near term. Market attention will remain on SiMn supply-demand shifts and futures fluctuations.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
1 hour ago
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
Read More
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
【Flash | DOWA’s H2 Zinc Plan Rises 27%, Potentially Supporting Indium Recovery】
DOWA Holdings plans to produce 113,543 tonnes of zinc in H2 FY2026, up 27.0% from its H1 plan of 89,373 tonnes and 26.8% from the 89,525 tonnes produced in H2 FY2025. Its Akita Zinc operation uses the hematite process to recover indium and other valuable metals at high yields and integrates zinc smelting with rare-metal production and recycling. Higher planned zinc output may increase feed throughput for by-product indium recovery. However, DOWA disclosed no indium production target, and any supply increase will depend on feed grades, recovery rates and operating schedules rather than zinc volumes alone.
1 hour ago
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
1 hour ago
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
Read More
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】
Kobrea Exploration Corp. announced the approval of a US$4 million 2026/27 exploration programme for the Western Malargüe Mining District in Mendoza Province, Argentina, fully funded by BHP. The programme includes diamond drilling at the El Destino copper-gold-molybdenum porphyry target, induced-polarisation surveys at El Destino and KBX-17, as well as geological mapping, geochemical sampling and hyperspectral work. The exploration alliance covers seven projects totaling approximately 733 square kilometres, where copper, gold and molybdenum geochemical anomalies have been identified. SMM analysis: approval of the new budget moves the BHP-Kobrea partnership from an alliance framework into an active drilling phase. However, the properties remain at an early exploration stage, with no molybden
1 hour ago
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
1 hour ago
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
Read More
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
Glencore plans to submit the environmental impact report for its El Pachón copper-molybdenum project in Argentina in Q1 2027 and aims to secure approval under the Incentive Regime for Large Investments, or RIGI, before July 2027. Glencore previously reported approximately 6 billion tonnes of mineral resources grading an average 0.43% copper, 2.2 g/t silver and 130 g/t molybdenum, equivalent to around 0.013% Mo. Based on the disclosed tonnage and average grade, the resource contains roughly 780,000 tonnes of in-situ molybdenum, although this does not represent reserves, recoverable metal or future production. During the 2025/26 exploration season, the project completed 53 drill holes totaling 21,246 metres and advanced preliminary road and bridge infrastructure.
1 hour ago
Register to Continue Reading
Gain access to the latest insights in metals and new energy
Already have an account?Sign in here