【Flash | BHP-Funded Programme Advances Drilling at Argentina’s El Destino Copper-Gold-Molybdenum Target】

Published: Oct 05, 2026 10:54 (GMT+8)
Kobrea Exploration Corp. announced the approval of a US$4 million 2026/27 exploration programme for the Western Malargüe Mining District in Mendoza Province, Argentina, fully funded by BHP. The programme includes diamond drilling at the El Destino copper-gold-molybdenum porphyry target, induced-polarisation surveys at El Destino and KBX-17, as well as geological mapping, geochemical sampling and hyperspectral work. The exploration alliance covers seven projects totaling approximately 733 square kilometres, where copper, gold and molybdenum geochemical anomalies have been identified. SMM analysis: approval of the new budget moves the BHP-Kobrea partnership from an alliance framework into an active drilling phase. However, the properties remain at an early exploration stage, with no molybden

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
8 mins ago
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
Read More
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
【Flash | Glencore Targets Q1 2027 Environmental Filing for El Pachón Copper-Molybdenum Project】
Glencore plans to submit the environmental impact report for its El Pachón copper-molybdenum project in Argentina in Q1 2027 and aims to secure approval under the Incentive Regime for Large Investments, or RIGI, before July 2027. Glencore previously reported approximately 6 billion tonnes of mineral resources grading an average 0.43% copper, 2.2 g/t silver and 130 g/t molybdenum, equivalent to around 0.013% Mo. Based on the disclosed tonnage and average grade, the resource contains roughly 780,000 tonnes of in-situ molybdenum, although this does not represent reserves, recoverable metal or future production. During the 2025/26 exploration season, the project completed 53 drill holes totaling 21,246 metres and advanced preliminary road and bridge infrastructure.
8 mins ago
【Flash | UK Expands Iran-Related Controls on Molybdenum Products】
1 hour ago
【Flash | UK Expands Iran-Related Controls on Molybdenum Products】
Read More
【Flash | UK Expands Iran-Related Controls on Molybdenum Products】
【Flash | UK Expands Iran-Related Controls on Molybdenum Products】
The UK’s strengthened Iran sanctions entered into force on September 29. The new controlled schedules cover molybdenum and related articles under HS 8102 and include uniform spherical or atomised molybdenum and molybdenum-alloy powders containing at least 97% molybdenum with particle sizes of 500 micrometres or less. Restrictions also extend to related supply, delivery, technical assistance, brokering and financial services. SMM analysis: The measures increase compliance barriers for Iran-related high-purity molybdenum trade under UK jurisdiction, although the direct impact on global supply and demand is likely limited because no affected volume was disclosed.
1 hour ago
【Flash | Elmet Wins $36 Million DLA Contract for Molybdenum and Tungsten Materials】
1 hour ago
【Flash | Elmet Wins $36 Million DLA Contract for Molybdenum and Tungsten Materials】
Read More
【Flash | Elmet Wins $36 Million DLA Contract for Molybdenum and Tungsten Materials】
【Flash | Elmet Wins $36 Million DLA Contract for Molybdenum and Tungsten Materials】
Elmet Technologies has been awarded an approximately $36 million contract by the US Defense Logistics Agency to supply the National Defense Stockpile with titanium-zirconium-molybdenum alloy billets, bars and ingots, as well as specialised molybdenum and tungsten wire. The materials are intended for jet-engine components and other high-temperature aerospace applications. Elmet did not disclose delivery volumes, contract duration or the value split between molybdenum and tungsten products. SMM analysis: The award confirms US defence-sector procurement demand for high-performance molybdenum materials, but cannot yet be translated into additional molybdenum consumption due to the absence of physical volumes.
1 hour ago