Guohua Wulatezhongqi Wind Power to Hydrogen and Ammonia Integrated Project (Hydrogen and Ammonia Section) Receives Filing.
According to the project announcement, the Guohua Wulatezhongqi Wind Power to Hydrogen and Ammonia Integrated Project (Hydrogen and Ammonia Section) is located south of the central axis road in Ganqimaodu Port Processing Park, Wulatezhong Banner, Bayannur City, north of S215, east of Jing'er Road, and west of the planned Jingwu Road. The project entity is Guohua (Bayannur) New Energy Co., Ltd.
The project will construct 442,000 Nm³ of water electrolysis hydrogen production, 3.778 million Nm³ of hydrogen storage, 3x450,000 mt/year of ammonia synthesis, and supporting facilities such as air separation and compression, water supply and drainage, and storage and transportation. The plant area is divided into functional zones, including production and administrative management facilities, equipment areas, public utility and auxiliary facilities, and storage and transportation facilities. The total investment is 1.318 billion yuan.
Project details are as follows:
Project Filing Notice
Project Code: 2508-150824-04-01-996322
Project Entity: Guohua (Bayannur) New Energy Co., Ltd.
Your submitted Guohua Wulatezhongqi Wind Power to Hydrogen and Ammonia Integrated Project (Hydrogen and Ammonia Section) industrial project filing (NDRC) meets the industrial policy and market entry standards, and is approved for filing. Please proceed with the relevant work. Before commencing construction, you must complete other legal procedures required by law before starting. This is to inform you!
Construction Location: South of the central axis road in Ganqimaodu Port Processing Park, Wulatezhong Banner, Bayannur City, north of S215, east of Jing'er Road, and west of the planned Jingwu Road
Total Investment: 1.318 billion yuan, of which own funds: 3.954 billion yuan, applied bank loans: 9.226 billion yuan, other 0 yuan
Planned Construction Period: 2026/10 to 2028/12
Construction Scale and Content: The project will construct 442,000 Nm³ of water electrolysis hydrogen production, 3.778 million Nm³ of hydrogen storage, 3x450,000 mt/year of ammonia synthesis, and supporting facilities such as air separation and compression, water supply and drainage, and storage and transportation. The plant area is divided into functional zones, including production and administrative management facilities, equipment areas, public utility and auxiliary facilities, and storage and transportation facilities.
Supplementary Explanation: If the project legal person changes after filing, or if there are significant changes in the construction location, scale, content, or if the total investment changes by more than 20%, or if the project is abandoned, the project entity must promptly inform the filing authority through the online platform and update the relevant information or revoke the filing. An energy conservation review is required before commencement, and dynamic project information must be reported online after commencement.
Note: If the project does not commence construction within 2 years from the date of filing or no other procedures have been carried out, and the project entity decides to continue the project, an explanation should be made through the online platform; if the project is no longer to be continued, the filing should be revoked. If no explanation is provided and the filing is not revoked within 2 years, the filing authority will delete the filed project and announce it on the online platform.
Wulate Zhongqi Development and Reform Commission
Aug 14, 2025
For queries, please contact Lemon Zhao at lemonzhao@smm.cn
For more information on how to access our research reports, please email service.en@smm.cn