Tender for High Carbon Low-grade NPI Procurement by Angang Heavy Machinery Roller Company

Published: Jul 10, 2025 19:16

1. Procurement Conditions

The procurer of this procurement project, high-carbon low-grade NPI (AGZJGSHGXHD250710223541) for Ansteel Heavy Machinery Roll Co., Ltd., is the Procurement Center of Ansteel Heavy Machinery Co., Ltd. The funds for the procurement project are self-raised, and the project is now ready for procurement. A public inquiry and comparison is being conducted.

2. Project Overview and Procurement Scope

2.1 Project Name: High-carbon low-grade NPI for Ansteel Heavy Machinery Roll Co., Ltd.

2.2 Alternative procurement method if procurement fails: Not applicable

2.3 For details on the procurement content, scope, and scale of this project, please refer to the attached "Material List Attachment.pdf".

3. Bidder Qualification Requirements

3.1 Consortium bidding is not allowed for this procurement.

3.2 For this procurement, the bidder must meet the following qualification requirements:

(1) Circulation business license

(2) Production business license

3.3 For this procurement, the bidder must meet the following registered capital requirements:

Production registered capital: 3 million yuan (10,000 yuan) or above

Circulation registered capital: 3 million yuan (10,000 yuan) or above

3.4 For this procurement, the bidder must meet the following performance requirements:

1. Required to provide enterprise qualification documents that have passed the annual inspection:

(1) Scanned copy of the business license (or duplicate).

(2) Scanned copy of the tax registration certificate (or duplicate) (except for those with a unified three-in-one certificate).

(3) Scanned copy of the organization code certificate (or duplicate) (except for those with a unified three-in-one certificate).

2. Performance requirements: Provide a scanned copy of a contract and corresponding invoice for no less than 100 mt of goods that meet the tender requirements.

3.5 For this procurement, the bidder must meet the following capability requirements, financial requirements, and other requirements:

Financial requirements: Please refer to the attachment (if necessary)

Capability requirements: Please refer to the attachment (if necessary)

Other requirements: (1) The bidding manufacturer must conduct technical exchanges with the site. Otherwise, if the proposed winning bidder fails to meet production requirements and deadlines as required, does not sign the contract, or fails to complete the work as required after signing the contract, and is held accountable, its qualification as a relevant party will be revoked, and it will not be allowed to participate in any project bidding of Ansteel Roll Co., Ltd. for two years. It will also be reported to Ansteel Group and listed as a gray-list or black-list enterprise.

(2) A product quality certificate for the past year is required, and the inspection institution must have qualifications at or above the prefectural level.

(3) Measurement method: The quantity measured by the measurement center of Angang Steel shall prevail.

(4) The seller agrees to adjust the delivery time and quantity according to the actual production needs of the buyer.

(5) The bidding supplier must have spot cargo sources. Once winning the bid, the supplier shall make timely and successive deliveries.

(6) A 5% contract performance bond shall be charged for this tender.

(7) To maintain the continuity of production and ensure the quality of our company's products, and to introduce more suppliers to participate in the bidding competition, suppliers that win the bid for the first time for this project of Angang Roll Company shall undergo on-site audit and certification. After passing the audit, they may sign a "supply instead of trial" contract. The share of the "supply instead of trial" contract shall not exceed 30% of the total tender quantity. The original suppliers agree to follow the bid, with a winning bid quantity of 70% of the total tender quantity, while the new suppliers' winning bid quantity is 30% of the total.

3.6 For projects that must be tendered according to the law in this procurement, the bids submitted by dishonest persons subject to enforcement shall be invalid.

4. Acquisition of procurement documents

4.1 Those who are interested in participating in the bidding shall log in to the Angang Smart Tendering and Bidding Platform at http://bid.ansteel.cn from 19:00 on July 10, 2025 to 13:00 on July 18, 2025 (Beijing time, the same hereinafter) to download the electronic procurement documents.

Click to view details:》Procurement Announcement for High-Carbon Low-Grade NPI of Angang Heavy Machinery Roll Company

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
High-Grade NPI Smelter Profits Squeezed as Ore Prices Rise and Sales Prices Dip
1 hour ago
High-Grade NPI Smelter Profits Squeezed as Ore Prices Rise and Sales Prices Dip
Read More
High-Grade NPI Smelter Profits Squeezed as Ore Prices Rise and Sales Prices Dip
High-Grade NPI Smelter Profits Squeezed as Ore Prices Rise and Sales Prices Dip
[SMM Nickel Flash] Based on nickel ore prices from 25 days ago, smelter profits for high-grade NPI remained high this week. However, from the current raw material side, ore prices from both the Philippines and Indonesia increased, while auxiliary material prices saw a slight pullback, leading to an increase in the cash cost of producing high-grade NPI from spot ore. At the same time, high-grade NPI prices experienced some pullback, making it difficult for smelter profits to see sustained improvement.
1 hour ago
High-Grade NPI Prices Fall, Expected to Stabilize as Chinese New Year Approaches
1 hour ago
High-Grade NPI Prices Fall, Expected to Stabilize as Chinese New Year Approaches
Read More
High-Grade NPI Prices Fall, Expected to Stabilize as Chinese New Year Approaches
High-Grade NPI Prices Fall, Expected to Stabilize as Chinese New Year Approaches
[SMM Nickel Flash] This week, due to a sharp decline in futures triggering arbitrage selling, high-grade NPI prices fell significantly. However, after the selling activity subsided, upstream quotations and the market center gradually returned to normal levels, supported by cost factors. Looking ahead, as the Chinese New Year holiday approaches, market activity is expected to remain subdued, and high-grade NPI prices are projected to hover at highs with limited fluctuations.
1 hour ago
Nickel Prices Drop: SMM 10-12% High-Grade NPI Down 17.2 Yuan, Indonesia NPI FOB Index Falls 2.06 $/mtu
1 hour ago
Nickel Prices Drop: SMM 10-12% High-Grade NPI Down 17.2 Yuan, Indonesia NPI FOB Index Falls 2.06 $/mtu
Read More
Nickel Prices Drop: SMM 10-12% High-Grade NPI Down 17.2 Yuan, Indonesia NPI FOB Index Falls 2.06 $/mtu
Nickel Prices Drop: SMM 10-12% High-Grade NPI Down 17.2 Yuan, Indonesia NPI FOB Index Falls 2.06 $/mtu
[SMM Nickel Flash] The SMM average price of 10-12% high-grade NPI fell 17.2 yuan/mtu WoW to 1,035.8 yuan/mtu (ex-factory, tax included), while the Indonesia NPI FOB index average price dropped 2.06 $/mtu WoW to 131.2 $/mtu. At the beginning of the week, futures hit limit-down, and nickel prices fell sharply WoW, driving the emergence of arbitrage supplies sold at low prices, leading to a significant decline in high-grade NPI prices.
1 hour ago