Total investment of 1.6875 billion yuan! Yunnan Energy Investment and CGN Wind Power secured 375MW of PV indicators in Yunnan

Published: Apr 27, 2025 17:48 (GMT+8)
Polaris Solar PV Network learned that on April 25, Honghe Prefecture, Yunnan Province, announced the selection results for the project owners of 14 PV power generation projects included in the second and third batches of new energy project construction lists for Yunnan Province in 2024, namely Project (I), Project (III), Project (IV), and Project (V). Yunnan Energy Investment Group and China General Nuclear Power Wind Power Co., Ltd. successfully secured 375MW project indicators, with a total project investment of 1.6875 billion yuan.

Polaris Solar PV Network learned that on April 25, Honghe Prefecture, Yunnan Province, announced the selection results for the owners of 14 PV power generation projects included in the second and third batches of Yunnan Province's 2024 new energy project construction lists, specifically for Projects (1), (3), (4), and (5). Yunnan Energy Investment Group and CGN Wind Power Co., Ltd. successfully secured 375 MW of project indicators, with a total project investment of 1.6875 billion yuan.

Details are as follows:

Announcement of Selection Results for the Owners of 14 PV Power Generation Projects Included in the Second and Third Batches of Yunnan Province's 2024 New Energy Project Construction Lists in Honghe Prefecture, Projects (1), (3), (4), and (5)

Entrusted by the Honghe Prefecture Energy Bureau, Honghe Prefecture Construction Project Tendering Co., Ltd. organized and completed the evaluation meetings for the selection of owners for the 14 PV power generation projects included in the second and third batches of Yunnan Province's 2024 new energy project construction lists in Honghe Prefecture at 9:00 a.m. on March 19, 2025, at the conference room on the 2nd floor of No. 8 Hongjian Jiayuan Business Network, 1 Huguo Road, Mengzi City, Honghe Prefecture, Honghe Prefecture Construction Project Tendering Co., Ltd. After evaluation by the expert panel and confirmation by the entrusting party, the selection results are now announced as follows:

(1) Project Name: Selection of Owner for the Kubo PV Power Generation Project

1. Project Number: HHZB20250050

2. Project Scale: The proposed installed capacity is 130,000 kW.

3. Planned Investment: 585 million yuan.

4. Planned Construction Period: To be implemented in accordance with the construction period specified in Document Yunnan Development and Reform Commission Energy [2023] No. 264.

5. Project Location: Dayangjie Township, Honghe County.

6. Selected Enterprise: Yunnan Energy Investment Group Co., Ltd.

(2) Project Name: Selection of Owner for the Bugan PV Power Generation Project

1. Project Number: HHZB20250052

2. Project Scale: The proposed installed capacity is 130,000 kW.

3. Planned Investment: 585 million yuan.

4. Planned Construction Period: To be implemented in accordance with the construction period specified in Document Yunnan Development and Reform Commission Energy [2023] No. 264.

5. Project Location: Sancun Township and Diema Township, Honghe County.

6. Selected Enterprise: CGN Wind Power Co., Ltd.

(3) Project Name: Selection of Owner for the Zhaya PV Power Generation Project

1. Project Number: HHZB20250053

2. Project Scale: The proposed installed capacity is 40,000 kW.

3. Planned Investment: 180 million yuan.

4. Planned Construction Period: To be implemented in accordance with the construction period specified in Document Yunnan Development and Reform Commission Energy [2023] No. 264.

5. Project Location: Jiache Township, Honghe County.

6. Selected Enterprise: CGN Wind Power Co., Ltd.

(4) Project Name: Selection of Owner for the Lianhuatan PV Power Generation Project

1. Project Number: HHZB20250054

2. Project Scale: The proposed installed capacity is 75,000 kW.

3. Planned Investment: 337.5 million yuan.

4. Planned Construction Period: To be implemented in accordance with the construction period specified in Document Yunnan Development and Reform Commission Energy [2023] No. 264.

5. Project Location: Lianhuatan Township, Hekou County.

6. Selected Enterprise: CGN Wind Power Co., Ltd.

Entrusting Party: Honghe Prefecture Energy Bureau

Contact Person: Pan Chun

Telephone: 0873-3949862

Agency: Honghe Prefecture Construction Project Tendering Co., Ltd.

Contact Person: Hou Jianwei

Telephone: 0873-3038448

April 25, 2025

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Proposes Tighter Solar Technology Export Controls: What Next for the Ex-China Region? [SMM Analysis]
7 hours ago
China Proposes Tighter Solar Technology Export Controls: What Next for the Ex-China Region? [SMM Analysis]
Read More
China Proposes Tighter Solar Technology Export Controls: What Next for the Ex-China Region? [SMM Analysis]
China Proposes Tighter Solar Technology Export Controls: What Next for the Ex-China Region? [SMM Analysis]
On 16 October, China's Ministry of Commerce (MOFCOM) and Ministry of Science and Technology announced proposed revisions to the Catalogue of Technologies Prohibited and Restricted from Export, alongside temporary pre-export registration requirements for the technologies concerned. The solar sector accounts for 12 technologies covering polysilicon, wafer and cell manufacturing. Certain key and core equipment incorporating these technologies also falls within the scope.
7 hours ago
[SMM Analysis] Silver Down Nearly 20% From Stage High: Why Are Solar Cell Prices Not Following?
8 hours ago
[SMM Analysis] Silver Down Nearly 20% From Stage High: Why Are Solar Cell Prices Not Following?
Read More
[SMM Analysis] Silver Down Nearly 20% From Stage High: Why Are Solar Cell Prices Not Following?
[SMM Analysis] Silver Down Nearly 20% From Stage High: Why Are Solar Cell Prices Not Following?
Silver prices fell 19.6% from August 27 to October 15, lowering solar cell costs, yet cell prices held steady. SMM data show 210R prices steady at RMB 0.310/W, while 210N prices rose and 183 prices edged down. Production line upgrades and output cuts tightened supply, while export orders and utility-scale demand supported key formats. Near-term pricing remains driven by supply-demand fundamentals.
8 hours ago
[SMM PV Flash] Sigenergy Named National-Level Specialized and Sophisticated "Little Giant" Enterprise!
12 hours ago
[SMM PV Flash] Sigenergy Named National-Level Specialized and Sophisticated "Little Giant" Enterprise!
Read More
[SMM PV Flash] Sigenergy Named National-Level Specialized and Sophisticated "Little Giant" Enterprise!
[SMM PV Flash] Sigenergy Named National-Level Specialized and Sophisticated "Little Giant" Enterprise!
Recently, Shanghai Sigenergy Intelligent Technology Co., Ltd., a subsidiary of Sigenergy New Energy, was recognized by the Ministry of Industry and Information Technology and included in the national-level list of specialized and sophisticated "little giant" enterprises. This recognition is a national-level endorsement of Sigenergy's independent innovation capabilities, core technological strength, and market competitiveness in the PV+ESS+charging sector.
12 hours ago