Recently, the 250 MW PV hydrogen production project of Shenzhen Energy Group Beikong Company in Otog Front Banner passed the special acceptance and successfully obtained the mobile pressure vessel filling license, marking that the project has operational capabilities and can carry out hydrogen filling and external sales.
This project is one of the first batch of wind and solar power hydrogen production demonstration projects in Inner Mongolia Autonomous Region. It uses new energy PV power generation for hydrogen production, adopts alkaline water electrolysis technology, with an annual hydrogen production capacity of over 6,700 mt, and is equipped with corresponding green hydrogen storage and transportation equipment. The produced green hydrogen product has reached an excellent purity level.
Project Basic Information
Project Legal Entity: Shenergy North (Otog Front Banner) Energy Development Co., Ltd.
Project Name: Otog Front Banner Shanghai Temple Economic Development Zone PV Hydrogen Production Project in Ordos City.
Project Address: Shanghai Temple Economic Development Zone, Otog Front Banner, Ordos City, Inner Mongolia.
Project Designed Capacity
The project is designed with an annual hydrogen production capacity of about 6,000 mt. After the completion of the first and second phases, the annual hydrogen production capacity will exceed 6,700 mt, with a hydrogen purity of 99.999%.
Project Construction Content and Scale
Including the construction of a new PV power station with an installed capacity of 250 MW and an average annual power generation of 470 million kWh, as well as a water electrolysis hydrogen production plant with an annual capacity of 6,000 mt and supporting facilities. A hydrogen production and refueling integrated station and corresponding hydrogen energy storage and transportation equipment will also be constructed.
Total Project Investment
The total investment is 1.62 billion yuan, of which 317 million yuan is self-owned funds, and the remaining investment is planned to be solved through financing.
Project Construction Significance and Impact
After the project is put into operation, the average annual power generation will be about 470 million kWh, which can replace about 146,000 mt of standard coal and reduce carbon dioxide emissions by 390,000 mt. The energy-saving and emission-reduction effects are significant. It is of great significance for promoting the implementation of the dual controls on energy consumption and energy intensity in Ordos City, achieving the renewable energy consumption weight target, improving people's livelihood and expanding employment, and promoting high-quality economic development in the region.