[SMM Coal and Coke Shipping] Total SMM Coal Arrivals at Ports: 8.257 Million mt

Published: Mar 17, 2025 07:30 (GMT+8)
[SMM Coal and Coke Shipping] By port: The total coal port arrivals monitored by SMM reached 8.257 million mt, up 10% MoM. Among them, arrivals at Guangzhou Port totaled 947,000 mt, accounting for 11% of the total, down 17% MoM.

By Port: The total SMM coal arrivals reached 8.257 million mt, up 10% MoM. Among them, Guangzhou Port recorded total arrivals of 947,000 mt, accounting for 11% of the total arrivals, down 17% MoM.

 

 

 

1. For data mentioned in the report, please log in to the SMM database

(https://data-pro.smm.cn/) to view.

2. For more details on SMM steel shipping data, steel industry information, analysis reports, databases, and other content, please contact the SMM Steel Division Hou Lei at 021-51595960.

» Subscribe to view historical SMM metal spot prices.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Wari Railway's Fall 2026 centralized maintenance completed]
1 min ago
[Wari Railway's Fall 2026 centralized maintenance completed]
Read More
[Wari Railway's Fall 2026 centralized maintenance completed]
[Wari Railway's Fall 2026 centralized maintenance completed]
At 8:30 a.m. on September 23, the fall 2026 centralized maintenance on the Wari Railway, a heavy-haul corridor for transporting coal out of Shanxi, was completed, laying a solid track foundation for the upcoming winter thermal coal supply guarantee. The Wari Railway starts from Watang Town, Xing County, Lvliang, Shanxi Province in the west and ends at Rizhao Port in Shandong Province in the east, traversing the three provinces of Shanxi, Henan, and Shandong. It is an important corridor for transporting coal from the west to the east and is also China's first heavy-haul railway built with a 30-ton axle load in a single phase. This centralized maintenance on the Wari Railway began on September 4. Over 20 days, three hours were used each day to carry out comprehensive, multi-dimensional renewal and maintenance of all facilities and equipment along the entire line. A total of 26.313 km of large-machine ballast cleaning, 255.51 km of large-machine track tamping, 120 sets of large-machine turnout tamping, and 323.35 km of large-machine rail grinding were completed, with all types of facilities and equipment receiving in-depth "checkups" and extensive upgrades. During the centralized maintenance period, China Railway Taiyuan Group invested more than 80 large machines, over 30 small machines, and a construction workforce of 1,660 people to improve operational efficiency. At the same time, refined management was applied throughout the entire centralized maintenance process, with daily dynamic optimization of train operation plans to ensure rapid resumption of operations after construction and minimize the impact of construction on transportation. It is understood that the Wari Railway's transport capacity has continued to be released. After annual freight volume exceeded 100 million mt in 2022 and 2023, freight volume reached 100.07 million mt in 2025, marking the third time annual volume surpassed 100 million mt. In the first eight months of this year, the Wari Railway completed a cumulative freight volume of 75.3299 million mt, playing a positive role in ensuring energy security.
1 min ago
[SMM Analysis] Construction Steel Fundamentals Continue to Improve This Period
2 mins ago
[SMM Analysis] Construction Steel Fundamentals Continue to Improve This Period
Read More
[SMM Analysis] Construction Steel Fundamentals Continue to Improve This Period
[SMM Analysis] Construction Steel Fundamentals Continue to Improve This Period
According to SMM data, both mill stocks and social inventory of construction steel saw destocking of varying degrees this period. Total construction steel inventory stood at 7.1381 million mt, down 508,600 mt PoP, or -6.65%, with the destocking pace notably accelerating.
2 mins ago
Pre-Holiday Stockpiling Demand Released, Accelerating Building Materials Social Inventory Destocking This Period
5 mins ago
Pre-Holiday Stockpiling Demand Released, Accelerating Building Materials Social Inventory Destocking This Period
Read More
Pre-Holiday Stockpiling Demand Released, Accelerating Building Materials Social Inventory Destocking This Period
Pre-Holiday Stockpiling Demand Released, Accelerating Building Materials Social Inventory Destocking This Period
5 mins ago