[SMM Hydrogen Energy Policy Express] Zhenjiang, Jiangsu: Actively Promoting the Full-Chain Development of Hydrogen Energy "Production, Storage, Transportation, and Utilization"

Published: Mar 14, 2025 09:36

On March 6, the Zhenjiang Development and Reform Commission of Jiangsu Province issued a notice to solicit public opinions on the "Policies and Measures to Accelerate the Comprehensive Green Transformation of Economic and Social Development (Draft for Comments)."

The notice pointed out the need to strategically plan for emerging future industries such as artificial intelligence, low-altitude economy, new-type energy storage, and hydrogen energy, and to support Danyang City, the Economic Development Zone, and the High-Tech Zone in actively striving to become provincial-level pilot zones for future industries.

Orderly development of distributed wind power projects will be carried out, with localized development of biomass energy and geothermal energy. Efforts will be made to accelerate the deployment of a number of sustainable fuel projects and actively promote the full-chain development of hydrogen energy, including production, storage, transportation, and utilization. The implementation of the three major initiatives—"Green Electricity into Zhenjiang," "Green Electricity into Parks," and "Green Electricity into Enterprises"—will also be advanced.

Efforts will be intensified to promote renewable energy substitution, with a focus on deep integration of renewable energy into industries such as steel, chemicals, building materials, and paper manufacturing. Technologies such as electric boilers, electric kilns, and electric heating will be promoted, while green processes like green hydrogen refining and hydrogen smelting will be actively explored.

 

 

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
11 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
11 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
11 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
11 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
11 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
11 hours ago