DEWA Invites Bids for 2-GW Seventh Phase of Mohammed bin Rashid Al Maktoum Solar Park in Dubai

Published: Mar 10, 2025 10:29
The Dubai Electricity and Water Authority (DEWA) is inviting interested parties to submit Expressions of Interest (EOI) for the construction of the 2-GW seventh phase of the Mohammed bin Rashid Al Maktoum Solar Park in the UAE, a key component of Dubai's flagship solar project.

The Dubai Electricity and Water Authority (DEWA) is inviting interested parties to submit Expressions of Interest (EOI) for the construction of the 2-GW seventh phase of the Mohammed bin Rashid Al Maktoum Solar Park in the UAE, a key component of Dubai's flagship solar project.

The Phase VII expansion will add between 1.6 GW and 2 GW of solar photovoltaic (PV) capacity, alongside a 1-GW battery energy storage system (BESS) expected to provide six hours of storage. According to official documents, the project will be developed on an independent power project (IPP) basis. The deadline for submissions is March 21, and the selected developer will be awarded a long-term power purchase agreement (PPA).

By 2030, the Mohammed bin Rashid Al Maktoum Solar Park is expected to exceed 5 GW of total capacity, with the seventh phase set to be commissioned in stages starting from August 2027.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Cutting 6-series, moving away from CATL: Behind the buzz in August's auto market, ternary is being repriced
3 hours ago
[SMM Analysis] Cutting 6-series, moving away from CATL: Behind the buzz in August's auto market, ternary is being repriced
Read More
[SMM Analysis] Cutting 6-series, moving away from CATL: Behind the buzz in August's auto market, ternary is being repriced
[SMM Analysis] Cutting 6-series, moving away from CATL: Behind the buzz in August's auto market, ternary is being repriced
3 hours ago
Approximately $1.4 billion! India plans 130 billion rupee battery component incentive program
5 hours ago
Approximately $1.4 billion! India plans 130 billion rupee battery component incentive program
Read More
Approximately $1.4 billion! India plans 130 billion rupee battery component incentive program
Approximately $1.4 billion! India plans 130 billion rupee battery component incentive program
Recently, according to India's Business Standard, the Indian government is formulating an advanced battery component incentive program totaling approximately 130 billion rupees (about $1.4 billion). The program's incentive scope covers key battery cell components, including cathode and anode active materials, electrolyte, separators, and copper foil. According to sources familiar with the matter, the program has completed inter-ministerial consultations and is about to be submitted to the Ministry of Finance's Expenditure Finance Committee for approval.
5 hours ago
August Oxide Electrolyte Analysis:  How Does the "Solid-Liquid Hybrid Main Engine" Perform Amid Price Divergence?
5 hours ago
August Oxide Electrolyte Analysis: How Does the "Solid-Liquid Hybrid Main Engine" Perform Amid Price Divergence?
Read More
August Oxide Electrolyte Analysis:  How Does the "Solid-Liquid Hybrid Main Engine" Perform Amid Price Divergence?
August Oxide Electrolyte Analysis: How Does the "Solid-Liquid Hybrid Main Engine" Perform Amid Price Divergence?
In August 2026, oxide electrolytes continued their role as the "main engine for solid-liquid hybrid batteries." LATP prices dropped to just over RMB 90/kg, while LLZO held steady at RMB 638/kg. Unlike sulfide electrolytes, which saw record-high production but a meager capacity utilization rate of just 5.82%, the oxide route。
5 hours ago
DEWA Invites Bids for 2-GW Seventh Phase of Mohammed bin Rashid Al Maktoum Solar Park in Dubai - Shanghai Metals Market (SMM)