The Winning Bid Result Announced for Shuoyang New Energy's 10GW Heterojunction Solar Cell Project (Phase I) Equipment Procurement

Published: Mar 10, 2025 08:42
[Winning Bid Result Announcement for Shuoyang New Energy's 10GW Heterojunction Solar Cell Project (Phase I) Equipment Procurement] On March 5, Sichuan Shuoyang Heterojunction New Energy Co., Ltd. announced the winning bid result for the equipment procurement of the 10GW high-efficiency heterojunction (HDT) solar cell project (Phase I: 5GW) located in Leshan High-Tech Zone. The procurement includes 2GW wet process equipment, tube furnaces and automation, laser equipment, and printing line equipment for Workshop 1. Among them, the bid winners for Sections 1 and 3 are Kunshan Shengcheng Optoelectronic Technology Co., Ltd., and the bid winners for Sections 2 and 4 are Suzhou Chengtuo Intelligent Equipment Co., Ltd. (Polaris Solar PV Network)

On March 5, Sichuan Shuoyang Heterojunction New Energy Co., Ltd. announced the winning bid result for the procurement of wet process equipment, tube furnaces and automation, laser equipment, and printing line equipment for Workshop 1 (2GW) of the Leshan High-Tech Zone 10GW High-Efficiency Heterojunction (HDT) Solar Cell Project (Phase I: 5GW).

Among them, the bid winner for Sections 1 and 3 is Kunshan Shengcheng Optoelectronic Technology Co., Ltd., and the bid winner for Sections 2 and 4 is Suzhou Chengtuo Intelligent Equipment Co., Ltd.

According to the tender documents, this tender project is divided into four sections, detailed as follows:

Section 1: Procurement of wet process equipment for Workshop 1 (2GW) of the Leshan High-Tech Zone 10GW High-Efficiency Heterojunction (HDT) Solar Cell Project (Phase I: 5GW) by Sichuan Shuoyang Heterojunction New Energy Co., Ltd.;

Section 2: Procurement of tube furnaces and automation equipment for Workshop 1 (2GW) of the Leshan High-Tech Zone 10GW High-Efficiency Heterojunction (HDT) Solar Cell Project (Phase I: 5GW) by Sichuan Shuoyang Heterojunction New Energy Co., Ltd.;

Section 3: Procurement of laser equipment for Workshop 1 (2GW) of the Leshan High-Tech Zone 10GW High-Efficiency Heterojunction (HDT) Solar Cell Project (Phase I: 5GW) by Sichuan Shuoyang Heterojunction New Energy Co., Ltd.;

Section 4: Procurement of printing line equipment for Workshop 1 (2GW) of the Leshan High-Tech Zone 10GW High-Efficiency Heterojunction (HDT) Solar Cell Project (Phase I: 5GW) by Sichuan Shuoyang Heterojunction New Energy Co., Ltd.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
11 hours ago
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
Read More
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
It is understood that the National Energy Administration has officially approved the power source allocation plan for the "Qaidam Desert Base (East Golmud) Base". The planned construction scale of the power source projects at this base is 17.44 million kilowatts, including 10 million kilowatts of photovoltaic power, 5 million kilowatts of wind power, 2.64 million kilowatts of coal-fired power, 0.1 million kilowatts of solar thermal power, and 1.5 million kilowatts (for 4 hours) of electrochemical energy storage. The total investment in the projects is about 86 billion yuan. The new energy will be transmitted to Guangxi through the "Qinghai-Guangxi DC" UHV power transmission project. Currently, significant progress has been made in the preliminary work of the "Qinghai-Guangxi DC" project, w
11 hours ago
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Feb 6, 2026 09:17
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Read More
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Armenia’s cumulative solar capacity has surged to 1.1 GW following the addition of approximately 615 MW in 2025. This rapid expansion has pushed solar's share of electricity generation to around 15%, effectively meeting the country's 2030 target years ahead of schedule. The growth is heavily driven by a net-metering scheme supporting over 50,000 autonomous producers (totaling 650 MW), though the government ended loan subsidies for rooftop solar in July to shift focus toward battery storage.
Feb 6, 2026 09:17
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Read More
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
The Winning Bid Result Announced for Shuoyang New Energy's 10GW Heterojunction Solar Cell Project (Phase I) Equipment Procurement - Shanghai Metals Market (SMM)