Announcement of Winning Candidates for the Procurement of Components for the Qianxin Intelligent Manufacturing Rooftop Distributed PV Project

Published: Mar 7, 2025 18:04
【Announcement of Winning Candidates for Qianxin Intelligent Manufacturing Rooftop Distributed PV Project Module Procurement】 On March 7, the winning candidates for the PV module procurement (third round) of the Qianxin Intelligent Manufacturing Rooftop Distributed PV Power Generation Project were announced. The first-ranked winning candidate is Chint New Energy Technology Co., Ltd., with a bid price of 4.2898 million yuan and a unit price of 0.72 yuan/W. The second-ranked winning candidate is Hongyuan Green Energy Co., Ltd., with a bid price of 4.0878 million yuan and a unit price of 0.686 yuan/W.

On March 7, the winning candidates for the procurement of PV modules for the Qianxin Intelligent Manufacturing Rooftop Distributed PV Power Generation Project (third round) were announced. The first-ranked candidate is Chint New Energy Technology Co., Ltd., with a bid price of 4.2898 million yuan and a unit price of 0.72 yuan/W. The second-ranked candidate is Hongyuan Green Energy Co., Ltd., with a bid price of 4.0878 million yuan and a unit price of 0.686 yuan/W. The third-ranked candidate is Ningbo OSDA Solar Co., Ltd., with a bid price of 41.1102 billion yuan and a unit price of 0.69 yuan/W.

According to the tender announcement, the total procurement capacity is 5.958 MW (power not less than 610 Wp; model: N-type monocrystalline silicon modules). The delivery date is within 7 days from the date of notification by the bid inviter after signing the contract. From the date of passing the delivery inspection, the linear power warranty period for the PV modules will reach 25 years, and the product workmanship warranty period will reach 12 years.

The project is planned to install a PV power generation system on the rooftops of Factory Buildings #1 and #2 with color steel tiles, the concrete rooftop of the office building, and the carport at the factory area of Chongqing Qianxin Intelligent Manufacturing Technology Co., Ltd. This project will use N-type monocrystalline silicon modules, with an installed capacity of approximately 5.958 MWp, and will utilize a rooftop area of about 42,000 m². The "self-consumption with surplus electricity fed into the grid" model will be adopted. The construction site is located within the factory area of Chongqing Qianxin Intelligent Manufacturing Technology Co., Ltd., Changshou District, Chongqing.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
4 hours ago
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
Read More
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
China Approves 17.44 GW Power Plan for Qaidam Desert Base, Including Solar, Wind, and Energy Storage Projects
It is understood that the National Energy Administration has officially approved the power source allocation plan for the "Qaidam Desert Base (East Golmud) Base". The planned construction scale of the power source projects at this base is 17.44 million kilowatts, including 10 million kilowatts of photovoltaic power, 5 million kilowatts of wind power, 2.64 million kilowatts of coal-fired power, 0.1 million kilowatts of solar thermal power, and 1.5 million kilowatts (for 4 hours) of electrochemical energy storage. The total investment in the projects is about 86 billion yuan. The new energy will be transmitted to Guangxi through the "Qinghai-Guangxi DC" UHV power transmission project. Currently, significant progress has been made in the preliminary work of the "Qinghai-Guangxi DC" project, w
4 hours ago
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Feb 6, 2026 09:17
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Read More
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
[SMM PV News] Armenia Hits 1.1 GW Solar Capacity,
Armenia’s cumulative solar capacity has surged to 1.1 GW following the addition of approximately 615 MW in 2025. This rapid expansion has pushed solar's share of electricity generation to around 15%, effectively meeting the country's 2030 target years ahead of schedule. The growth is heavily driven by a net-metering scheme supporting over 50,000 autonomous producers (totaling 650 MW), though the government ended loan subsidies for rooftop solar in July to shift focus toward battery storage.
Feb 6, 2026 09:17
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Read More
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Spot Market and Domestic Inventory Brief Review (February 5, 2026) [SMM Silver Market Weekly Review]
Feb 5, 2026 17:36
Announcement of Winning Candidates for the Procurement of Components for the Qianxin Intelligent Manufacturing Rooftop Distributed PV Project - Shanghai Metals Market (SMM)