Silver By-Product Production at Smelters Steadily Rises in 2024, with Cumulative YoY Growth Exceeding 7% [SMM Analysis]

Published: Feb 12, 2025 10:17 (GMT+8)
[SMM Analysis: Silver By-Product Production at Smelters to Rise Steadily in 2024, Cumulative Increase Exceeds 7% YoY] According to SMM, the production of silver by-products at primary lead smelters is expected to rise steadily in 2024, with a cumulative total exceeding 8,000 mt, up over 7% YoY. The increase in silver production at lead smelters in 2024 will mainly occur in H2.

According to SMM, the production of silver by-products from primary lead smelters is expected to steadily increase in 2024, with a cumulative total exceeding 8,000 mt, up over 7% YoY.

The increase in silver production from lead smelters in 2024 will mainly occur in H2. On one hand, the tight supply of lead concentrates and silver-lead ores in H1 2024 limited the production of refined lead and precious metal recovery at several lead smelters. This raw material shortage is expected to ease with the recovery of overseas supply and the concentrated arrival of imported ores at smelters. Additionally, silver prices in 2024 are operating at a near five-year high, prompting lead smelters to prioritize higher recovery rates of precious metals by using raw materials with higher silver content, thereby achieving greater "coefficient difference" profits.

 

In the raw material market, due to the rangebound movement of silver prices from 2020 to 2023, the pricing coefficient for silver in lead concentrates (with silver content of 200–2,500 g/mt) was frequently adjusted. For certain mine products with silver content below 1,000 g, the pricing coefficient was adjusted only 1–2 times annually. Since 2024, with silver prices surpassing 6,000 yuan/kg, the pricing coefficients for silver in various types of lead ores have been raised. At the beginning of 2025, under a macro environment of heightened risk-aversion sentiment, the precious metals market is expected to remain bullish, and lead smelters continue to hold optimistic expectations for silver prices. In certain regions, the pricing coefficient for silver-lead ores with silver content of 1,500–2,500 g/mt has shown signs of slight increases again. However, smelters are not optimistic about the silver-rich content of newly constructed lead-zinc projects. Despite the high added-value attribute of silver remaining a major source of revenue for lead smelters in 2025, the supply of silver-bearing lead ore raw materials is still in undersupply, and the growth rate of silver production from lead smelters in 2025 may slow down.

Click here to view the SMM Metal Industry Chain Database  

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
19 mins ago
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Read More
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
Stockpiling Concludes, Secondary Lead Inventory Buildup Expected During Next Week's Holiday [SMM Secondary Lead Inventory Weekly Review]
19 mins ago
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
28 mins ago
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
Read More
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
Masivo Intersects 32.5 Metres of Polymetallic Mineralisation at Cerro Colorado Grading 0.271% Zinc and 0.141% Lead
Masivo Silver reported assays from CC-26-001, the first hole of its 2026 drilling program at the Cerro Colorado project in Sonora, Mexico. The hole intersected 32.50 metres from 226.30 to 258.80 metres grading 0.271% zinc, 0.141% lead, 7.0 g/t silver, 0.025% copper and 0.010 g/t gold. A separate 5.10-metre interval from 215.10 metres graded 0.611% zinc, 0.121% lead and 24.0 g/t silver. The hole was terminated at 259.5 metres because of technical drilling difficulties while still within altered and mineralised rock. Masivo plans to integrate the assays with geological, structural, alteration and geophysical information to guide follow-up drilling testing lateral and vertical continuity. The company states that all reported intervals are drilled lengths and true widths have not yet been determined.
28 mins ago
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
33 mins ago
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
Read More
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
【Flash | 5N Plus Expands Utah Facility Handling Indium Antimonide】
5N Plus plans to expand its St. George, Utah facility by approximately 50%, with completion targeted for H2 2027. The site transforms indium antimonide and other specialty materials into semiconductor materials, wafers, substrates and selected components, with recovery, purification and crystal-growth capabilities. New equipment will be installed progressively, but InSb-specific capacity was not disclosed; the 50% figure refers to the facility expansion, not indium demand.
33 mins ago