![](https://static.metal.com/common.metal.com/images/header-en/downward.png)
![](https://static.metal.com/common.metal.com/images/header-en/arrow_right_black.png)
![](https://static.metal.com/common.metal.com/images/header-en/arrow_right_black.png)
![](https://static.metal.com/common.metal.com/images/header-en/arrow_right_black.png)
![](https://static.metal.com/common.metal.com/images/header-en/arrow_right_black.png)
![](https://static.metal.com/common.metal.com/images/header-en/arrow_right_black.png)
![](https://static.metal.com/common.metal.com/images/header-en/downward.png)
On February 8, the Yunnan Huadian 2025 Annual PV EPC General Contracting Framework Tender Announcement was released. According to the announcement, the project scale is 1,500 MW, and the tender procurement project is located at various PV project sites within Yunnan Province. The project duration is from March 1, 2025, to February 28, 2026.
The tender project is divided into one section, specifically as follows:
The Yunnan Huadian 2025 Annual PV EPC General Contracting Framework Tender Project includes, but is not limited to, project management, partial preliminary work, post-feasibility study survey and design (excluding transmission and ESS engineering), equipment and material procurement, construction and installation, project management for owner-procured and contractor-signed items, commissioning, testing, acceptance, production preparation, and other comprehensive tasks within the construction scope of this tender project, excluding the scope of supervision projects handled by the employer. It also involves assisting the employer in coordinating the construction of the entire power station.
Bidder Qualification Requirements
1. The bidder must be an independent legal entity or other organization legally registered within the People's Republic of China, with the capacity to assume civil liability and the right to enter into contracts;
2. The bidder must not be under orders to cease production or business operations, in bankruptcy proceedings, undergoing asset restructuring, under receivership, or have frozen assets. The business license must not have been revoked;
3. The bidder must not be within the penalty period of being prohibited from bidding as confirmed by administrative authorities or relevant documents of China Huadian Corporation Ltd.;
4. Legal entities, other organizations, or individuals with a conflict of interest with the tenderer that may affect the fairness of the tender are not allowed to participate in the bidding. Units with the same person in charge or with controlling or management relationships are not allowed to bid for the same section or the same tender project without section division;
5. The bidder must not be listed in the "List of Enterprises with Serious Violations of Law and Dishonesty" in the National Enterprise Credit Information Publicity System by the market supervision authority (if not removed during the evaluation period);
6. The bidder must not be listed in the "List of Dishonest Entities" on the "Credit China" website (.cn/xinyongfuwu/?navPage=4) during the evaluation period (if not removed during the evaluation period).
7. The bidder must not fall under any of the following circumstances:
1) Providing consulting services for the preliminary work of the tender project (except for publicly completed project proposals, feasibility study reports, and preliminary design documents);
2) Acting as the supervisor for this tender project;
3) Acting as the construction agent for this tender project;
4) Acting as the tender agent for this tender project;
5) Having the same legal representative or a controlling or shareholding relationship with the supervisor, construction agent, or tender agent of this tender project;
8. The bidder must have a Grade II or above qualification for general contracting of electric power engineering construction or a Grade B or above qualification for professional design in the electric power industry (new energy generation).
9. If the bidder is a construction unit, it must hold a valid safety production license issued by the construction administrative authority.
10. Performance requirements: From January 1, 2020, to the bid submission deadline (based on the commissioning date), the bidder must have at least one single project with a capacity of 50 MW or above for PV EPC general contracting that has been commissioned, and at least one EPC general contracting (or PC construction general contracting) project for a booster station with a voltage level of 220 kV or above that has been commissioned. All bidding performance records must be supported by the following valid and relevant proof materials:
(1) Scanned copies of key contract information: contract cover (or first page), contract scope page or list page or main technical requirements (parameters) page, signed and sealed page, and other relevant content proving the authenticity of the performance.
(2) Scanned copies of commissioning proof materials stamped by the owner: commissioning certificate, or production handover document, or safety and stability operation certificate, or quality acceptance report, or other materials proving commissioning.
11. Consortium bids are not accepted for this project.
The bid opening time is 09:00 on March 3, 2025.
For queries, please contact William Gu at williamgu@smm.cn