2025 Chinese New Year Break Duration for Copper Downstream Industries Revealed [SMM Analysis]

Published: Jan 17, 2025 18:25

》Check SMM Copper Quotes, Data, and Market Analysis

》Click to View Historical Price Trends of SMM Spot Copper

SMM January 17 News:
      As the Chinese New Year approaches, various industries are gradually entering the holiday mode. To provide a clearer understanding of the actual situation, SMM conducted a detailed survey of over 100 downstream copper enterprises, and the results are summarized as follows:

From the chart above, we can see that in 2025, only the copper foil industry has a significantly shorter holiday duration compared to last year. The holiday durations for the copper pipe & tube and enamelled wire industries remain the same as last year, while other sectors generally have an increase of 1 to 2 days compared to last year. The secondary copper rod industry, affected by policy issues, has the longest holiday duration.

However, looking at the average operating rate from January to February 2025, it is expected that only the operating rate of the secondary copper rod industry will decline, while other industries will see varying degrees of increase. Notably, the operating rates of the copper pipe & tube, copper foil, and copper billet industries are expected to achieve double-digit growth. The specific conditions of each industry are detailed below:

2025 Copper Cathode Rod Enterprises' Chinese New Year Holiday Arrangements [SMM Analysis]

2025 Secondary Copper Rod Enterprises' Chinese New Year Holiday Arrangements [SMM Analysis]

2025 Copper Plate/Sheet and Strip Enterprises' Chinese New Year Holiday Situation [SMM Analysis]

2025 Copper Pipe & Tube Enterprises' Chinese New Year Holiday Arrangements [SMM Analysis]

Non-Stop During Chinese New Year: Copper Foil Enterprises' Operating Levels Expected to Significantly Exceed the Same Period in 2024 [SMM Analysis]

2025 Copper Billet Enterprises' Chinese New Year Holiday Arrangements and Post-Holiday Market Outlook [SMM Analysis]

2025 Electric Wire and Cable Enterprises' Chinese New Year Holiday Plans Summary [SMM Analysis]

2025 Enamelled Wire Enterprises' Chinese New Year Holiday Arrangements [SMM Analysis]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
12 hours ago
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
Read More
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG’s Gediktepe Sulphide Expansion Produces First Copper and Zinc Concentrates; Full Production Targeted by End-2026
ACG Metals announced on September 1 that its Gediktepe mine in Türkiye produced its first copper concentrate on August 31, marking the start of the ramp-up phase. The company will progressively increase throughput and optimise plant performance, targeting full production by the end of 2026. Gediktepe’s steady-state annual production target is 20,000–25,000 tonnes of copper equivalent. The full announcement also confirmed that the mine produced its first zinc concentrate in August 2026, although the specific date and volumes were not disclosed. SMM estimates the mine’s zinc-in-concentrate production at approximately 10,000–15,000 tonnes of contained zinc in 2026.
12 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
13 hours ago
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
Read More
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
[ SMM Analysis ] A Visual Guide to the 2026 Semi-Annual Reports of 19 Copper Smelters
13 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
15 hours ago
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Read More
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
MMG Places US$64 Million Equipment Order to Support Khoemacau Expansion in Botswana
Epiroc has secured an approximately SEK610 million (US$64 million) order from MMG Limited and its mining contractors, China Huaye and 23MCC, for underground mining equipment to support the expansion of the Khoemacau Copper Mine in Botswana. The order includes face drilling rigs, production drilling rigs, cable-bolting rigs, loaders and underground mine trucks, together with remote-control systems, spare parts, training and on-site technical support. The equipment will support MMG’s ongoing Khoemacau expansion, which is designed to increase annual production capacity from approximately 60,000 tonnes to 130,000 tonnes of copper metal in concentrate. The project includes construction of a new 4.5 Mt/y processing plant, which will lift total milling capacity to more than 8 Mt/y, alongside development of Zone 5 North, Mango and Zeta North-East. First copper concentrate from the expansion is expected in H1 2028. Epiroc said delivery of the new underground fleet will begin in Q4 2026 and is expected to be completed by Q2 2028, broadly aligning with the expansion schedule. The ordered fleet includes Boomer face drilling rigs, Simba production drilling rigs, Cabletec cable-bolting rigs, Scooptram loaders and Minetruck underground trucks, with several units equipped for automation and remote-control operation. The equipment order represents another execution milestone for the already-approved Khoemacau expansion, rather than a new production target. With procurement progressing and equipment deliveries scheduled through Q2 2028, the project continues to advance toward MMG’s planned increase in copper-in-concentrate capacity to 130,000 tonnes per year. The expansion represents a significant planned increase in Khoemacau’s copper production capacity in Botswana’s Kalahari Copper Belt.
15 hours ago