Market Sentiment Unchanged, SHFE Zinc Fluctuates at Low Levels [SMM Morning Comment]

Published: Sep 09, 2024 09:53 (GMT+8)
Source: SMM
SMM, Sep 9: U.S. August non-farm payrolls saw the largest increase since June this year; the unemployment rate ended a four-month rise;

SMM, Sep 9: U.S. August non-farm payrolls saw the largest increase since June this year; the unemployment rate ended a four-month rise; US Fed Governor Waller: Will support early rate cuts if appropriate, and larger rate cuts if necessary; U.S. Treasury Secretary Yellen: Currently does not see warning signs of financial risks; Israeli negotiators believe that the possibility of reaching a Gaza hostage agreement is "close to zero"; the National Development and Reform Commission urgently allocated 200 million yuan to support Hainan and Guangdong in post-typhoon emergencies; PBOC halted gold purchases for the fourth consecutive month, with foreign exchange reserves remaining above $3.2 trillion for nine consecutive months; China Securities Regulatory Commission: Extended the restriction period for former employees' stock holdings.
Last Friday, LME zinc opened at $2737/mt, fluctuated around the daily moving average after the opening, climbed during the midday, reached a high of $2780/mt, then fell back, reaching a low of $2702/mt at the end of the session, and finally closed down at $2705/mt, a decrease of $25.5/mt, or 0.93%. Trading volume decreased to 11,819 lots, and open interest increased by 5,177 lots to 230,000 lots. Last Friday, LME zinc formed a bearish candlestick, with LME zinc inventory declining by 900 mt to 238,375 mt, a decrease of 0.38%, the upper 5-day moving average formed resistance. US August non-farm payrolls data was lower-than-expected, intensifying concerns about the economic slowdown, and the bearish macroeconomic conditions continued to pressure zinc prices, causing LME zinc to sink.
Last Friday, the most-traded SHFE zinc 2410 contract opened at 22,920 yuan/mt, initially climbed to 23,040 yuan/mt, then declined, reaching a low of 22,635 yuan/mt at the end of the session, and finally closed down at 22,690 yuan/mt, a decrease of 160 yuan/mt, or 0.70%. Trading volume increased to 112,000 lots, and open interest decreased by 819 lots to 94,479 lots. Last Friday, SHFE zinc formed a bearish candlestick, with the lower Bollinger Bands providing support. On the fundamentals side, weak demand continued to drag, with market bearish sentiment unchanged, SHFE zinc maintained low-level fluctuations.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
【SMM Flash News】Eureka Plans 3D IP Survey to Refine Drill Targets at Cabin Lake Silver-Lead-Zinc-Gold Project
12 mins ago
【SMM Flash News】Eureka Plans 3D IP Survey to Refine Drill Targets at Cabin Lake Silver-Lead-Zinc-Gold Project
Read More
【SMM Flash News】Eureka Plans 3D IP Survey to Refine Drill Targets at Cabin Lake Silver-Lead-Zinc-Gold Project
【SMM Flash News】Eureka Plans 3D IP Survey to Refine Drill Targets at Cabin Lake Silver-Lead-Zinc-Gold Project
Eureka Metals announced plans to commence a 3D induced-polarization survey shortly at its Cabin Lake silver-lead-zinc-gold project in British Columbia, Canada. SJ Geophysics will survey the West, New, Central, East and Bluff mineralized zones. The work follows July fieldwork that collected 622 soil and 96 rock samples. Survey results will be integrated with geological, geochemical and historical information to prioritize drill targets. An initial drilling program remains subject to receipt of the required permit.
12 mins ago
【SMM Flash News】Boab Raises Sorby Hills Resources by 7% and Signs Binding Mining Services Agreement
25 mins ago
【SMM Flash News】Boab Raises Sorby Hills Resources by 7% and Signs Binding Mining Services Agreement
Read More
【SMM Flash News】Boab Raises Sorby Hills Resources by 7% and Signs Binding Mining Services Agreement
【SMM Flash News】Boab Raises Sorby Hills Resources by 7% and Signs Binding Mining Services Agreement
Boab Metals updated resources at its Sorby Hills silver-lead project in Western Australia. Resources within the lead and net-smelter-return domains total 50.6 million tonnes, up 7%, grading 3.0% lead, 0.4% zinc and 34 g/t silver. The update covers Bimota, Omega and Norton and excludes recent assays from the 47-hole Phase IX program. On September 28, Boab also announced a binding mining-services heads of agreement with REGROUP Australia Pty Ltd . Site establishment is scheduled for January 15, 2027, with mining services commencing no later than March 1. Execution of the definitive contract is targeted within two weeks of the heads of agreement.
25 mins ago
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
1 hour ago
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
Read More
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
Altoro Metals Intersects Zinc Mineralization at Guajaraz Project in Spain
Altoro Metals (ASX: ARO) has reported progress in its maiden 1,400m diamond drilling program at the Guajaraz Zinc-Lead-Silver Project in central Spain. The company has completed three drill holes, with G-03 intersecting brown sphalerite veinlets that confirm zinc sulphide mineralization at depth. The program is designed to evaluate carbonate-hosted replacement-style zinc deposits and explore subparallel structures associated with the historical La Unión mine. While G-01 and G-05 remain in progress, G-05 has already encountered gneissic rock displaying intense hydrothermal alteration and low-grade mineralization. Core samples are undergoing systematic logging, with assay results expected within four to six weeks. Altoro is currently refining its drilling strategy to target high-potential zones while simultaneously progressing an application to extend the site's three-year exploration permit. Once G-01 is finalized, the company plans to redeploy one drill rig to its flagship Novales-Udías Project.
1 hour ago