Chongqing Hot Rolled Coil Inventory Edges Up This Week, Marking Annual Decline

Опубликовано: Sep 5, 2024 09:42

[SMM Chongqing Hot Rolled Coil Inventory] This week, Chongqing's inventory of hot rolled coils slightly accumulated.

This week, Chongqing's inventory of hot rolled coils reached 158,100 tonnes, up 3,800 tonnes from last week, an increase of 2.48%; a year-on-year decrease of 19,300 tonnes, a decrease of 10.88%...

Заявление об источниках данных: За исключением общедоступной информации, все остальные данные обрабатываются SMM на основе общедоступной информации, рыночного общения и с опорой на внутреннюю базу данных и модели SMM. Они приведены только для справки и не являются рекомендациями для принятия решений.

По любым вопросам или для получения дополнительной информации, пожалуйста, свяжитесь: lemonzhao@smm.cn
Для получения дополнительной информации о доступе к нашим исследовательским отчётам обращайтесь:service.en@smm.cn
Связанные новости
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
1 минуту назад
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Читать далее
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
【Sical Logistics Wins Five-Year Indian Mining Contract Covering About 9.1 Million Tonnes of Coal】
Indian integrated logistics and engineering services company Sical Logistics has secured a five-year mining contract worth approximately ₹5.3473 billion from Central Coalfields Limited for heavy earth-moving and mining operations at the SDOC Mine in Bokaro district, Jharkhand. The contract covers the re-handling of approximately 20.14 million cubic metres of overburden, the removal of around 33.65 million cubic metres of hard overburden, and the extraction of approximately 9.104 million tonnes of coal from a 143-hectare working area. The contract value includes an 18% goods and services tax, while the execution period is 1,825 days. A simple five-year average would place the contracted coal volume at approximately 1.82 million tonnes per year.
1 минуту назад
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
2 минут назад
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
Читать далее
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
【India’s ECL Begins Precautionary Sealing at Khandra Colliery】
Eastern Coalfields Limited (ECL) said on August 31 that it had begun precautionary sealing measures at Khandra Colliery in the Raniganj coal belt. Surface cracks and ground subsidence were first observed near the Nikanth Temple on July 28. ECL said unauthorised structures and illegal occupants in the affected area had restricted surface-filling work. As the cracks could not be properly filled, external air could enter the underground workings, aggravate the spontaneous heating of residual coal and further increase the risk of spontaneous combustion. ECL therefore initiated the sealing measures to protect employees and surrounding areas and will continue monitoring conditions at the site. Existing employees will be redeployed to other units of the same mine or neighbouring mines according to operational requirements. The sealing measures will not disrupt existing water or electricity supplies to residential quarters. ECL has not determined how long the sealing will remain in place and rejected reports suggesting that the colliery could be sealed for three months. The final duration will be determined based on expert advice, technical assessments and established mine-safety requirements.
2 минут назад
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
2 минут назад
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
Читать далее
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
【Drought in East Kalimantan Lowers Mahakam River Levels, Coal Barge Loads Reportedly Fall by About 21%】
Extreme drought has lowered river levels in East Kalimantan, disrupting transportation operations for some coal producers. Data from Indonesia’s meteorological agency showed that East Kalimantan received almost no rainfall in August. To prevent barges from running aground, local producers have been forced to reduce their coal loads. A local port official said that barges normally capable of carrying 7,000 tonnes of coal are currently limited to approximately 5,500 tonnes, representing a reduction of 1,500 tonnes, or about 21.4%, per trip. Some barges continue to face difficulties travelling upstream despite carrying reduced loads. The industry group noted that the decline in carrying capacity per trip will require more voyages and raise logistics costs.
2 минут назад