Published: Aug 2, 2024 18:01
[SMM Analysis: Gansu-Zhejiang UHV DC Transmission Project Officially Launched, Aluminum Wire Leading Enterprises Continue High-Load Production] In the past week, the announcement of the winning bids of State Grid has entered a stable phase, and there has been no significant increase in new orders in the market. However, according to SMM research, leading enterprises have more than enough orders in hand, and order delivery is still under tension, with production schedules extending into next year. As a result, enterprises continue to operate at high capacity. Regarding the progress of the UHV project, on July 29th, the Gansu-Zhejiang UHV DC Transmission Project was officially launched, with a total investment exceeding RMB 30 billion. It is expected to be officially put into operation in July 2027, passing through six provinces and covering a total length of approximately 2,370.1 km...

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
Read More
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Read More
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Co., Ltd. is making every effort to advance the construction of its new-type aluminum semis project with an annual capacity of 150,000 mt. Located in the Huoshaoshan Aluminum Downstream Industrial Park of Xinjiang Zhundong Economic and Technological Development Zone, the project involves a total investment of 180 million yuan and covers an area of 64 mu. It is planned to build two standardized production workshops with a total floor area of 23,000 m². In terms of production line configuration, the project will be equipped with two aluminum rod production lines, eight cast-rolling aluminum coil and strip production lines, and one cold-rolling aluminum coil and strip production line. Once fully completed and put into operation, the project is expected to achieve an annual production capacity of 60,000 mt of aluminum wire and 90,000 mt of aluminum coil.
2 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
2 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
Read More
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Commentary: Aluminum Futures Consolidate at Highs, ADC12 Spot Consolidates on a Strong Note] The aluminum alloy 2611 contract opened at 23,430 yuan/mt today, dipped to an intraday low of 23,320 yuan/mt where it found support before gradually rebounding, fluctuated within a range of 23,320-23,560 yuan/mt throughout the day, and closed at 23,435 yuan/mt, up 0.11%.
2 hours ago