Published: Jun 13, 2024 09:04
【SMM Early Review of Alumina: Enterprise Maintenance and New Production in Parallel, Tight Supply Remains Unchanged】 In recent days, some alumina plants in the north and south of China have reduced production due to equipment maintenance or energy supply issues. Domestic alumina operating capacity has declined compared with the early stage. On the other hand, some new alumina production capacity in China has entered the production stage recently, and this capacity may gradually increase in July. Currently, alumina supply is increasing and decreasing at the same time. The demand side, Yunnan has steadily resumed production, and the new project of Inner Mongolia Huayun's third phase will continue to be put into production, releasing demand benefits. The current domestic alumina supply and demand are both increasing. SMM believes that the tight balance of domestic alumina has not changed significantly in this stage. In the short term, the spot price of alumina will fluctuate and adjust mainly, and the price trend of alumina needs to be further guided by fundamentals under the interweaving of bullish and bearish sentiments. In the future...

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
Read More
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Read More
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Co., Ltd. is making every effort to advance the construction of its new-type aluminum semis project with an annual capacity of 150,000 mt. Located in the Huoshaoshan Aluminum Downstream Industrial Park of Xinjiang Zhundong Economic and Technological Development Zone, the project involves a total investment of 180 million yuan and covers an area of 64 mu. It is planned to build two standardized production workshops with a total floor area of 23,000 m². In terms of production line configuration, the project will be equipped with two aluminum rod production lines, eight cast-rolling aluminum coil and strip production lines, and one cold-rolling aluminum coil and strip production line. Once fully completed and put into operation, the project is expected to achieve an annual production capacity of 60,000 mt of aluminum wire and 90,000 mt of aluminum coil.
2 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
2 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
Read More
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Commentary: Aluminum Futures Consolidate at Highs, ADC12 Spot Consolidates on a Strong Note] The aluminum alloy 2611 contract opened at 23,430 yuan/mt today, dipped to an intraday low of 23,320 yuan/mt where it found support before gradually rebounding, fluctuated within a range of 23,320-23,560 yuan/mt throughout the day, and closed at 23,435 yuan/mt, up 0.11%.
2 hours ago