Arizona Lithium has begun production drilling at its Prairie project in Saskatchewan, Canada

Published: May 31, 2024 18:06
Source: SMM
Arizona Lithium has announced the start of production drilling at its Prairie project in Saskatchewan, Canada.

Arizona Lithium has announced the start of production drilling at its Prairie project in Saskatchewan, Canada. Located in the resource-rich Williston Basin, this project uses conventional oil and gas drilling methods to extract lithium-rich brine from aquifers approximately 2.3 km underground.

Managing Director Paul Lloyd stated in a press release, “We are excited to begin our drilling program as planned. The rig is on site, and the first well has been spudded and is currently being drilled.”

The drilling program, set to last several months, will encompass three pads. The initial phase involves drilling vertical wells to evaluate the commercial potential of the Souris River and Duperow formations, followed by assessments of the Dawson Bay formation and designated disposal targets. Production and disposal testing for the first pad is scheduled to commence in June, as per the Australia-based company's announcement.

The Prairie project boasts a mineral resource of 6.3 million tonnes of lithium carbonate equivalent (LCE), with 4.5 million tonnes indicated and 1.8 million tonnes inferred. Arizona Lithium aims to achieve commercial lithium production by 2025.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[Solid-state battery: Qinghai's 3,000 mt per year lithium sulfide project completed filing]
Aug 22, 2026 14:49
[Solid-state battery: Qinghai's 3,000 mt per year lithium sulfide project completed filing]
Read More
[Solid-state battery: Qinghai's 3,000 mt per year lithium sulfide project completed filing]
[Solid-state battery: Qinghai's 3,000 mt per year lithium sulfide project completed filing]
[Solid-State Battery: Qinghai 3,000 mt/year Lithium Sulfide Project Completes Filing] On August 10, 2026, the Online Approval and Supervision Platform for Investment Projects in Qinghai Province showed that Qinghai Weixiang Technology Co., Ltd.'s 3,000 mt/year lithium sulfide project completed the filing of an enterprise investment project. The project is located on the north side of Hanhai Road, Kunlun Economic Development Zone, Golmud City, Qinghai Province, with a total investment of 81.319 million yuan. It mainly involves building a 3,000 mt/year lithium sulfide production line and related supporting facilities, to be implemented in two phases (Phase I: 500 mt/year, Phase II: 2,500 mt/year), and is also capable of producing 10,000 mt of lithium sulfate. It is planned to be completed in July 2027. The core technology, "preparation of high-purity lithium sulfide by high-temperature low-pressure method," has been granted a national invention patent, jointly developed by Qinghai Weixiang Technology and the Qinghai Institute of Salt Lakes, Chinese Academy of Sciences.
Aug 22, 2026 14:49
[Solid-state battery: Zhidongli's H1 loss narrowed, strategically deployed lithium sulfide, a solid-state battery material]
Aug 22, 2026 14:46
[Solid-state battery: Zhidongli's H1 loss narrowed, strategically deployed lithium sulfide, a solid-state battery material]
Read More
[Solid-state battery: Zhidongli's H1 loss narrowed, strategically deployed lithium sulfide, a solid-state battery material]
[Solid-state battery: Zhidongli's H1 loss narrowed, strategically deployed lithium sulfide, a solid-state battery material]
[Solid-State Battery: Zhidongli Narrows H1 Loss, Strategically Positions in Solid-State Battery Materials] On August 21, 2026 (disclosed on August 22), Zhidongli (300686) released its semi-annual report. H1 revenue was 663 million yuan, down 13.7% YoY; net profit attributable to parent was a loss of 15.6069 million yuan, narrowing significantly compared to a loss of 40.98 million yuan in the same period last year. During the reporting period, the company actively expanded its new materials business, particularly making strategic investments in solid-state battery materials to optimize its industrial structure and achieve a second growth curve. Zhidongli plans to build a 5,000 mt/year high-purity lithium sulfide production site.
Aug 22, 2026 14:46
Cobalt Products Quotations in the Doldrums; Refined Cobalt Has Dropped Over 20,000 Yuan in a Single Week; Cobalt Sulphate Quotations Have Fallen for Five Consecutive Days! [Weekly Review]
Aug 22, 2026 08:44
Cobalt Products Quotations in the Doldrums; Refined Cobalt Has Dropped Over 20,000 Yuan in a Single Week; Cobalt Sulphate Quotations Have Fallen for Five Consecutive Days! [Weekly Review]
Read More
Cobalt Products Quotations in the Doldrums; Refined Cobalt Has Dropped Over 20,000 Yuan in a Single Week; Cobalt Sulphate Quotations Have Fallen for Five Consecutive Days! [Weekly Review]
Cobalt Products Quotations in the Doldrums; Refined Cobalt Has Dropped Over 20,000 Yuan in a Single Week; Cobalt Sulphate Quotations Have Fallen for Five Consecutive Days! [Weekly Review]
Aug 22, 2026 08:44
Arizona Lithium has begun production drilling at its Prairie project in Saskatchewan, Canada - Shanghai Metals Market (SMM)