【SMM Weekly Review: Market Slowly Recovers After Holiday, Anode Materials Remain Stable】

Published: Feb 23, 2024 20:03 (GMT+8)
Source: SMM
【SMM Weekly Review: Market Slowly Recovers After Holiday, Anode Materials Remain Stable】SMM News on February 23: Anode material prices remained weak this week. On the cost side, petroleum coke prices were stable during the Spring Festival holiday with normal production and shipments based on orders. With insufficient downstream support after the holiday, the rising trend before the holiday has basically stalled, and there are risks of a small decline afterwards. The demand for oil-based needle coke...

SMM News on February 23:

Anode material prices remained weak this week. On the cost side, petroleum coke prices were stable during the Spring Festival holiday with normal production and shipments based on orders. With insufficient downstream support after the holiday, the rising trend before the holiday has basically stalled, and there are risks of a small decline afterwards. The demand for oil-based needle coke continued to weaken during the Spring Festival holiday. Currently, the demand from downstream anode companies is extremely limited. Needle coke companies have mostly adjusted production focus to petroleum coke and calcined needle coke graphitization. Graphite outsourcing companies are currently under great survival pressure. In order to ensure production, some companies have quoted prices lower than costs, while the demand for outsourcing in the market continues to decline. On the demand side, downstream demand declined further during the Spring Festival holiday. Together with the sluggish logistics and other reasons, the order volume of anodes was quite limited. The market is slowly warming up after the holiday, and it is difficult to see a significant boost in demand in the short term. Most anode companies maintain low-load operations after the holiday, mainly to observe market dynamics. It is expected that anode material prices will remain stable in the short term, but the industry still has problems of overcapacity with fierce market competition. It is expected that there are still possibilities for prices to go downward afterwards.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
[SMM Analysis] Dazhong Mining's Jiada Mine Registers LCE Expansion
16 mins ago
[SMM Analysis] Dazhong Mining's Jiada Mine Registers LCE Expansion
Read More
[SMM Analysis] Dazhong Mining's Jiada Mine Registers LCE Expansion
[SMM Analysis] Dazhong Mining's Jiada Mine Registers LCE Expansion
16 mins ago
CATL Begins Trial Production at New Battery Plant in Hungary
19 mins ago
CATL Begins Trial Production at New Battery Plant in Hungary
Read More
CATL Begins Trial Production at New Battery Plant in Hungary
CATL Begins Trial Production at New Battery Plant in Hungary
[CATL Hungary Plant Starts Trial Production at New Battery Cell Facility] On September 22, CATL commenced trial production at its newly built battery cell plant in Debrecen, Hungary, having completed all prerequisite conditions required for the start of trial production. According to reports, this trial production is aimed at debugging, optimizing, and validating production equipment and manufacturing processes, in preparation for subsequent full-scale mass production. It is reported that in August 2022, CATL announced the construction of its second battery plant in Europe in Debrecen, Hungary, where the first battery cell facility began construction in the summer of 2023 and completed the installation of advanced production technologies and equipment by the spring of 2026. In August 2026, after obtaining the facility use permit, the company successively completed the prerequisite conditions required by relevant permits and IPPC (Integrated Pollution Prevention and Control) permit requirements, and officially commenced trial production of the first two production lines at the first battery cell production facility on September 22.
19 mins ago
Shanghai University of Technology launches 10 hydrogen-powered two-wheelers equipped with JHydrogen Technology’s 400W fuel cell system
49 mins ago
Shanghai University of Technology launches 10 hydrogen-powered two-wheelers equipped with JHydrogen Technology’s 400W fuel cell system
Read More
Shanghai University of Technology launches 10 hydrogen-powered two-wheelers equipped with JHydrogen Technology’s 400W fuel cell system
Shanghai University of Technology launches 10 hydrogen-powered two-wheelers equipped with JHydrogen Technology’s 400W fuel cell system
49 mins ago