SMM Morning Comment For SHFE Base Metals January 11

Published: Jan 11, 2024 09:57 (GMT+8)
Source: SMM
LME copper prices opened at $8341/mt and closed at $8391/mt in overnight trading, a rise of 0.74%, with the low-end of $8320/mt and the high-end of $8399/mt.

SHANGHAI, January 11 (SMM) –
Copper
LME copper prices opened at $8341/mt and closed at $8391/mt in overnight trading, a rise of 0.74%, with the low-end of $8320/mt and the high-end of $8399/mt. Trading volume was 25,000 lots, and open interest stood at 280,000 lots. The most active SHFE 2402 copper contract prices opened at 68010 yuan/mt and closed at 67920 yuan/mt last evening, down 0.01%, with the high-end of 68110 yuan/mt and the low-end of 67670 yuan/mt. Trading volumes stood at 17,000 lots and open interest stood at 121,000 lots. On the macro front, Fed official Williams said that policy restrictions should be relaxed only when it is convinced that the inflation rate is continuing to move toward 2%, dampening market expectations of interest rate cuts and putting pressure on copper prices. We need to pay attention to the US CPI data released today, as expectations for interest rate cuts may become clearer. In terms of fundamentals, from the supply side, a large amount of imported copper flows into domestic trade market, consumption recovery is limited, and the overall supply is relatively ample. However, there is room for arbitrage between Shanghai and Guangdong, and supply may goods flow into Guangdong, which may change the supply pattern. In terms of consumption, copper prices also dropped to new lows as premiums fell. Downstream consumption has picked up to a certain extent. If copper prices and premiums remain stable, active consumption is expected to be sustainable. In terms of price, the Federal Reserve's reappearance of "hawkish" speech dampened expectations of interest rate cuts, and copper prices are expected to be under certain pressure.
Aluminum
Overnight, the most-traded SHFE 2403 aluminium contract opened at 19,050 yuan/mt, with high and low at 19,050 yuan/mt and 18,975 yuan/mt before closing at 19,005 yuan/mt, up 5 yuan/mt or 0.03%. LME aluminium opened at $2,243.5/mt on Wednesday, with high and low at $2,258.5/mt and $2,230.5/mt respectively before closing at $2,235/mt, a drop of $7/mt or 0.31%.
From a macro perspective, the U.S. dollar dropped 0.16% overnight, and the market awaited inflation data due to be released this week for clues on when the Federal Reserve may cut interest rates. In terms of fundamentals, as the disturbance in the alumina supply faded, the domestic aluminium production entered a period of stable operation, with no significant fluctuations in the short term; as for demand, aluminium downstream operating rates continued to be weak, and the amount of aluminium ingot produced was expected to increase MoM. However, domestic aluminium ingot inventories continued to remain low, supporting aluminium prices. Short-term aluminium prices will remain volatile, and we need to pay close attention to the pace of the Federal Reserve's interest rate cuts, domestic consumption and inventory changes.
Lead
Overnight, LME lead prices opened at US$2,056/ton, reaching a maximum of US$2,091.5/ton, and finally closed at US$2,083/ton, an increase of 1.21%.
SHFE 2402 lead contract prices opened at 16415 yuan/mt last evening and finally closed at 16385 yuan/mt, up 0.64%. Open interest decreased 2900 lots to 34547 lots. In addition, the open interest of SHFE 2403 contract rose rapidly to 48,900 lots.
Zinc
Overnight, LME zinc prices opened at US$2,510.5/ton. During the European trading session, prices rose to an intraday high of US$2,538/ton before falling to a bottom of US$2,485/ton. It finally closed down at US$2,506/ton, down US$4/ton, or 0.16%. Trading volume rose to 8983 lots, and open interest added by 3627 lots to 209,000 lots. LME zinc inventory dropped by 1575 mt or 0.73% to 215225 mt. The chairman of the Federal Reserve stated that the interest rate cut plan will be slowed down this year. The market's expectations for the Fed's interest rate cut were once again exploited.
SHFE 2402 zinc opened at 21145 yuan/mt overnight and fell to a low of 21025 yuan/mt. Overnight, the most-traded SHFE 2402 zinc contract opened at 21290 yuan/mt and touched a low of 21110 yuan/mt before closing at 21075 yuan/mt, down 55 yuan/mt or 0.26%. Trading volume decreased 29508 lots, and open interest decreased by 306 lots to 66412 lots. The import window reopened and supply tightness eased.
Tin
SHFE 2402 tin contract rose overnight and closed at 206190 yuan/mt, up 0.90%.
Yesterday, spot premiums and discounts in domestic spot market for various tin ingot brands did not change much. Small brand tin ingots were offered at discounts of 100-500 yuan/mt against SHFE 2402 tin contract, versus premiums of 100-600 yuan/mt for delivery brands, premiums of 900-1100 yuan/mt for Yunxi brand, and discounts of 900-1200 yuan/mt imported brand tin ingots. Tin prices remained relatively low in early trading yesterday. Trading companies reported a slight decline in the purchasing enthusiasm of downstream companies.
Nickel
Overnight, the most-traded SHFE nickel contract opened at 125110 yuan/mt, and closed at 124920 yuan/mt, down 830 yuan/mt. Trading volume fell by 37275 lots, and open interest decreased by 1847 lots. From a macro perspective, we still need to pay attention to the U.S. non-seasonally adjusted CPI annual rate for December and the U.S. interest rate meeting on February 1. This will be the first interest rate meeting in 2024. From a fundamental perspective, pure nickel warrants were destocked slightly yesterday, with decline mainly contributed by Kaohsiung. Nickel price is expected to inch lower.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
33 mins ago
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
Read More
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
Sulphuric Acid Shortage Emerges as a Constraint on Zambia’s Copper Growth
Zambia’s sulphuric acid shortage is becoming a growing constraint on copper production and refining. Jubilee Metals reported acid costs rising by more than 200% in Q4 FY2026, while Sable cathode output fell to 250 t from 361 t in Q3. Government data also showed small-scale copper production down 35.2% YoY in H1 2026, highlighting the sector’s exposure to tight acid availability and higher processing costs.
33 mins ago
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
1 hour ago
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Read More
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Selkirk Copper Targets H2 2028 Restart of Minto Mine Following Positive PEA
Selkirk Copper Mines has outlined a potential restart of the past-producing Minto copper-gold-silver mine in Yukon, Canada, following the completion of a Preliminary Economic Assessment (PEA) that supports first concentrate production in the second half of 2028.​ The PEA outlines a 13-year mine life based on combined open-pit and underground mining, with operations designed around an average mining and milling rate of 4,100 mt/day. At peak production, the project is expected to produce approximately 27,200 mt/year of copper-equivalent contained in concentrate, equivalent to around 48,700 mt/year of high-grade copper-gold-silver concentrate.​ Initial capital required to re-establish production is estimated at C$186 million. Using the study's planning prices of US$5.00/lb copper, US$3,600/oz gold and US$50/oz silver, the PEA estimates an after-tax NPV at a 7% discount rate of C$494 million, an after-tax IRR of 47.8% and a payback period of approximately 1.9 years from first production.​ Minto benefits from substantial existing infrastructure from its previous operations, including a 4,100 mt/day processing plant as well as existing open-pit and underground infrastructure. Selkirk Copper said assessments of the site's existing infrastructure and equipment found that the majority remains in good working order and requires only minor attention and refurbishment.​ The company is targeting first concentrate production in H2 2028, followed by full ramp-up of mining, milling and concentrate production by H1 2029. A feasibility study is scheduled to begin in Q4 2026, while amended permit applications are also expected to be submitted during the fourth quarter. Selkirk Copper said a restart decision is targeted following completion of the feasibility study and receipt of permit amendments in H2 2027.​ The Minto PEA outlines a potential pathway for a previously producing copper operation to return to the market by 2028, supported by existing processing and mining infrastructure that could reduce the capital and construction requirements compared with a greenfield project. However, the 27,200 mt/year peak production figure represents copper-equivalent contained in concentrate rather than contained copper alone. The restart also remains subject to further feasibility work, permitting and project execution, making progress toward a restart decision in H2 2027 an important milestone to watch.
1 hour ago
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
2 hours ago
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Read More
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Tschudi Copper Mine Targets Early-2027 Mining Restart in Namibia
Consolidated Copper Corp (CCC) is targeting an early-2027 restart of open-pit mining at the Tschudi copper mine in northern Namibia, with an estimated US$30–40 million of development capital required to bring mining operations back online.​ Under the planned heap-leach restart, Tschudi is expected to reach run-rate copper cathode production of more than 14,000 mt/year over an initial 10-year mine life. CCC expects to complete a definitive feasibility study for the heap-leach mining restart in September 2026, with open-pit mining targeted to recommence in early 2027.​ The planned restart relates specifically to open-pit mining at Tschudi. Copper processing operations were restarted in 2024 using existing stockpiles, with CCC reporting production of more than 7,600 mt of copper cathode conforming to LME Grade A specifications as of June 2026. Tschudi previously produced approximately 75,000 mt of copper cathode between 2015 and 2020 before being placed on care and maintenance.​ The operation already has significant processing infrastructure in place, including a 2.88 million mt/year SX/EW plant. According to CCC, the US$30–40 million restart capital would primarily cover dewatering, mining mobilisation and demobilisation, a mobile crushing plant and development of a leach pad.​ CCC is also studying a larger expansion targeting Tschudi's sulphide resources. The concept includes construction of a 3 million mt/year flotation plant alongside the existing SX/EW operation, potentially increasing average annual production to approximately 30,000 mt of copper-equivalent over more than 10 years. The expansion remains under study and is separate from the planned heap-leach mining restart.​ The planned restart of open-pit mining at Tschudi could strengthen Namibia's copper supply by supporting run-rate cathode production of more than 14,000 mt/year if the project proceeds according to schedule. Existing SX/EW infrastructure and the relatively modest US$30–40 million restart capital requirement could support a faster return to mining compared with a greenfield development. However, the early-2027 restart remains a company target, with completion of the definitive feasibility study and subsequent mine mobilisation among the key milestones to watch.
2 hours ago