Published: Nov 6, 2023 11:14

On November 2nd, the main structure of the comprehensive building of the first shared energy storage station project in South China District, the Guizhou Ceheng Shared Energy Storage Project, which was undertaken by the Mechanical and Electrical Installation Branch, was successfully topped off, achieving another major node goal and laying a solid foundation for achieving the goal of power generation.

The comprehensive building of the project is a concrete frame structure with a total construction area of 480 square meters. The construction area is a mountainous landform, and the soil quality is poor, which makes the construction extremely difficult. The project department has made full use of the experience in dealing with special geology in previous projects and successfully completed this major engineering node, which has been unanimously praised by the owner and supervisor.

The project innovatively adopts the "shared energy storage" mode, which greatly relieves the pressure of new energy delivery in the Qianxi Southwest area, solves the randomness and fluctuation of new energy generation in the local power grid, improves the voltage level of the local power grid, improves the power supply quality, and ensures the safe and stable operation of the power grid. It is of great significance to promote the efficient utilization of clean energy.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
50 mins ago
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
Read More
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
50 mins ago
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
1 hour ago
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
Read More
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
Today, SMM battery-grade lithium carbonate spot prices drifted lower compared with the previous trading day. The lithium carbonate 2701 contract opened lower at 157,000 yuan/mt today, then fluctuated downward after the open. In the morning session, it traded weakly around the 156,000-157,000 yuan range, with an intraday high of 157,800 yuan/mt. Near midday, it quickly dropped to 153,200 yuan/mt, hitting a new intraday low. Around midday, prices seesawed repeatedly in the 154,000-156,000 yuan range. In the afternoon, bulls briefly pushed prices up but failed to break above the average price line. Prices weakened again in late trading, eventually closing down 3.2% at 154,800 yuan/mt, with open interest falling by 9,123 lots. In the spot market, downstream buyers purchased on dips as needed. At 155,000 yuan/mt and below, downstream spot order purchase willingness continued to recover. On the supply side, as prices drifted lower, willingness to sell spot orders remained weak, with some lithium chemical plants holding prices firm and holding back from selling. Overall, market inquiries and actual transactions were relatively active.
1 hour ago
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
2 hours ago
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
Read More
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
Key takeaway upfront: A Q4 spike is unlikely, but we do expect continued moderate growth. Monthly output is likely to settle in the 9–10 tonne range – a modest step-up from Q3, not an explosive leap.
2 hours ago