Published: Nov 2, 2023 14:22

On October 31, the second phase demonstration project of the largest power grid-side shared energy storage station in the country, the Shandong Qingyun Energy Storage Station, was put into commercial operation.

The Qingyun Energy Storage Station is located in Qingyun County, Dezhou City, Shandong Province, and is one of the first energy storage demonstration projects in Shandong Province. The total scale is 301 MW/602 MWh, and the first phase construction of 100 MW/200 MWh energy storage system has been grid-connected and put into production by the end of 2021. The second phase project has a capacity of 201 MW/402 MWh. After the station is put into production, it can absorb about 180 million kWh of new energy per year, equivalent to saving about 70,000 tons of standard coal and reducing carbon dioxide emissions by about 180,000 tons.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
45 mins ago
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
Read More
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
Magnesium Prices Rise for Three Consecutive Sessions! Cost Side Remains "Burning Hot" While Demand Side Struggles to Take Over [SMM Commentary]
45 mins ago
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
1 hour ago
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
Read More
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
SMM Daily Review: Lithium Carbonate Spot Prices Drifted Lower on September 2
Today, SMM battery-grade lithium carbonate spot prices drifted lower compared with the previous trading day. The lithium carbonate 2701 contract opened lower at 157,000 yuan/mt today, then fluctuated downward after the open. In the morning session, it traded weakly around the 156,000-157,000 yuan range, with an intraday high of 157,800 yuan/mt. Near midday, it quickly dropped to 153,200 yuan/mt, hitting a new intraday low. Around midday, prices seesawed repeatedly in the 154,000-156,000 yuan range. In the afternoon, bulls briefly pushed prices up but failed to break above the average price line. Prices weakened again in late trading, eventually closing down 3.2% at 154,800 yuan/mt, with open interest falling by 9,123 lots. In the spot market, downstream buyers purchased on dips as needed. At 155,000 yuan/mt and below, downstream spot order purchase willingness continued to recover. On the supply side, as prices drifted lower, willingness to sell spot orders remained weak, with some lithium chemical plants holding prices firm and holding back from selling. Overall, market inquiries and actual transactions were relatively active.
1 hour ago
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
2 hours ago
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
Read More
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
Battery-Grade Lithium Sulfide: Will Q4 See a Spike?
Key takeaway upfront: A Q4 spike is unlikely, but we do expect continued moderate growth. Monthly output is likely to settle in the 9–10 tonne range – a modest step-up from Q3, not an explosive leap.
2 hours ago
On October 31, the second phase demonstration project of the largest p - Shanghai Metals Market (SMM)