Published: Oct 17, 2023 09:48
Recently, Guangyuan Development Group, Shenzhen Zhongke Ruien and Guangyuan Economic and Technological Development Zone successfully signed a new aluminum-based negative lithium-ion battery line project. The new aluminum-based negative lithium-ion energy storage battery adopts a new aluminum-carbon composite material to replace the traditional graphite negative electrode, which has the remarkable characteristics of wide temperature range, long cycle, high safety, low cost, fast charging and discharging. The project is planned to be located in the Shipan Industrial Park of the Economic and Technological Development Zone, with a total investment of 1.217 billion yuan, a planned land area of about 200 mu, and two phases of construction. The first phase of the project has an investment of about 249 million yuan, and the annual operating income of the first phase of the project is about 320 million yuan after it is put into production.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
Read More
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Read More
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Co., Ltd. is making every effort to advance the construction of its new-type aluminum semis project with an annual capacity of 150,000 mt. Located in the Huoshaoshan Aluminum Downstream Industrial Park of Xinjiang Zhundong Economic and Technological Development Zone, the project involves a total investment of 180 million yuan and covers an area of 64 mu. It is planned to build two standardized production workshops with a total floor area of 23,000 m². In terms of production line configuration, the project will be equipped with two aluminum rod production lines, eight cast-rolling aluminum coil and strip production lines, and one cold-rolling aluminum coil and strip production line. Once fully completed and put into operation, the project is expected to achieve an annual production capacity of 60,000 mt of aluminum wire and 90,000 mt of aluminum coil.
2 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
3 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
Read More
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Commentary: Aluminum Futures Consolidate at Highs, ADC12 Spot Consolidates on a Strong Note] The aluminum alloy 2611 contract opened at 23,430 yuan/mt today, dipped to an intraday low of 23,320 yuan/mt where it found support before gradually rebounding, fluctuated within a range of 23,320-23,560 yuan/mt throughout the day, and closed at 23,435 yuan/mt, up 0.11%.
3 hours ago