Published: Aug 18, 2023 18:33
SMM Analysis: Caught Between a Rock and a Hard Place! Tight Supply of Raw Materials vs. Order Rebound - July Output Increase of Rebar is Weak. Since July, the downstream demand for rebar has obviously rebounded, and orders have increased significantly compared to June. However, due to the prominent shortage of raw materials since July and the impact of high temperatures, it has suppressed the production speed of enterprises. Entering August, the rebar market is still relatively lively. At present, most enterprises have sufficient orders and maintain normal production. But...

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
Read More
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
A00 pulls back slightly, aluminum scrap remains stable overall [Aluminum Scrap Daily Review]
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
2 hours ago
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Read More
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Advances 150,000 MT Annual Capacity Project in Zhundong Economic Zone
Xinjiang Boyuan Aluminum Co., Ltd. is making every effort to advance the construction of its new-type aluminum semis project with an annual capacity of 150,000 mt. Located in the Huoshaoshan Aluminum Downstream Industrial Park of Xinjiang Zhundong Economic and Technological Development Zone, the project involves a total investment of 180 million yuan and covers an area of 64 mu. It is planned to build two standardized production workshops with a total floor area of 23,000 m². In terms of production line configuration, the project will be equipped with two aluminum rod production lines, eight cast-rolling aluminum coil and strip production lines, and one cold-rolling aluminum coil and strip production line. Once fully completed and put into operation, the project is expected to achieve an annual production capacity of 60,000 mt of aluminum wire and 90,000 mt of aluminum coil.
2 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
2 hours ago
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
Read More
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Review] Aluminum futures fluctuate at highs; ADC12 spot consolidates on a strong note
[ADC12 Price Daily Commentary: Aluminum Futures Consolidate at Highs, ADC12 Spot Consolidates on a Strong Note] The aluminum alloy 2611 contract opened at 23,430 yuan/mt today, dipped to an intraday low of 23,320 yuan/mt where it found support before gradually rebounding, fluctuated within a range of 23,320-23,560 yuan/mt throughout the day, and closed at 23,435 yuan/mt, up 0.11%.
2 hours ago
SMM Analysis: Caught Between a Rock and a Hard Place! Tight Supply of - Shanghai Metals Market (SMM)