Daily Updates on SHFE Base Metals and Stainless Steel Warrants (May 26), with Nickel Merely 171 mt

Published: May 26, 2023 16:53 (GMT+8)
Source: SMM
SHANGHAI, May 26 (SMM) – The table below shows SHFE base metals and stainless steel warrants today and their changes from the previous day.

SHANGHAI, May 26 (SMM) – The table below shows SHFE base metals and stainless steel warrants today and their changes from the previous day.

Metal

Warrants (mt)

Change (mt)

Copper

42901

-1954

Aluminium

77705

-4347

Lead

23454

+400

Zinc

3958

-1435

Tin

8143

-104

Nickel

171

unchanged

Stainless steel

42016

-1140


Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Data: SHFE, DCE market movement (Oct 14)
4 mins ago
Data: SHFE, DCE market movement (Oct 14)
Read More
Data: SHFE, DCE market movement (Oct 14)
Data: SHFE, DCE market movement (Oct 14)
The following table shows the ferrous and nonferrous metals movement on the SHFE and DCE on 14 Oct , 2026
4 mins ago
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
19 mins ago
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Read More
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
【Flash | Regulator Orders Partial El Teniente Shutdown; Molybdenum Impact Remains Unconfirmed】
Chile’s National Geology and Mining Service ordered a temporary halt on October 13 at El Teniente’s North Crater waste dump and other areas exposed to avalanche or ground-movement risks, while stating that the order does not suspend the entire division. Amerigo Resources separately said its Minera Valle Central tailings operation was unaffected. El Teniente produced 1,483.1 metric tonnes of contained molybdenum in the first half of 2026, down 34.9% from a year earlier. No disruption to underground mining, concentrators or the molybdenum recovery circuit has been confirmed; SMM is not revising its forecast.
19 mins ago
【Flash | Lower Grade Cuts Kennecott Molybdenum Output 40% Despite Higher Throughput】
31 mins ago
【Flash | Lower Grade Cuts Kennecott Molybdenum Output 40% Despite Higher Throughput】
Read More
【Flash | Lower Grade Cuts Kennecott Molybdenum Output 40% Despite Higher Throughput】
【Flash | Lower Grade Cuts Kennecott Molybdenum Output 40% Despite Higher Throughput】
Rio Tinto reported that its wholly owned Kennecott operation's Bingham Canyon mine produced 2,600 tonnes of molybdenum concentrate containing 900 tonnes of molybdenum in the third quarter of 2026. Product mass fell 29.7% from the second quarter and contained molybdenum dropped 40.0%; year-on-year declines were 21.2% and 30.8%. Ore treated rose 46.5% quarter on quarter to 9.726 million tonnes, while copper in concentrate increased 66.8%, but the molybdenum ore grade fell from 0.049% to 0.028%. This indicates that lower molybdenum grade, rather than reduced throughput, drove the decline. Nine-month contained molybdenum output still rose 40.0% year on year to 4,900 tonnes.
31 mins ago