Demand-Driven Lithium Carbonate Supply Deficit Extends in October, Lifting its Prices

Published: Nov 15, 2022 17:19
Source: SMM
SHANGHAI, Nov 15 (SMM) - Lithium carbonate supply deficit recorded 7,995 mt in October amid rising supply and demand in the month. Chinese lithium carbonate output stood at 34,168 mt in October, up 4% MoM.

SHANGHAI, Nov 15 (SMM) - Lithium carbonate supply deficit recorded 7,995 mt in October amid rising supply and demand in the month. Chinese lithium carbonate output stood at 34,168 mt in October, up 4% MoM. And the YoY growth came in at 87%. Most domestic lithium salt manufacturers maintained normal and stable production amid the timely supplement of overseas raw materials. The production bases of some top-tier manufacturers reduced the production due to maintenance, hurting the overall operating rates. In addition, the production of manufacturers in Qinghai was also affected slightly by the low temperature starting from October. Hence lithium carbonate rose merely 4% MoM in October, while the demand picked up with terminal players rushing to produce around the end of the year. The output is likely to climb further MoM in November with the maintenance of top-tier manufacturers drawing to an end. The lithium carbonate is estimated at 37,294 mt in November, up 9% on the month and 99% on the year.

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
9 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
9 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
9 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
9 hours ago