SMM Evening Comments (Jul 7): Shanghai Nonferrous Metals All Closed with Gains after Hitting Low

Published: Jul 07, 2022 18:00 (GMT+8)
Source: SMM
Shanghai nonferrous metals closed with gains today after bottoming recently amid lingering pessimism on the macro front.

SHANGHAI, Jul 7 (SMM) – Shanghai nonferrous metals closed with gains today after bottoming recently amid lingering pessimism on the macro front.

Shanghai copper rose 1.35%, aluminium added 0.82%, lead increased 1.24%, zinc gained 2.99%, tin jumped 0.82%, and nickel advanced 0.21%.

Copper: The most-traded SHFE 2208 copper closed up 1.35% or 780 yuan/mt at 58,640 yuan/mt, with open interest down 11,772 lots to 152,780 lots.

On the macro front, the US dollar index rose to a 20-year high of 107.28 after the US services sector dropped to a more than two-year low in June. The US ISM non-manufacturing PMI registered 55.3 in June, above the forecast of 54.3 but below the previous value of 55.9, falling to its lowest level in two years.

In the spot market, the traded prices dropped again. Standard-quality copper was in premiums of 90-100 yuan/mt, and market transactions were limited, with some traded with premiums of 70-80 yuan/mt. Good-quality copper prices were relatively resilient, and varied between varieties. Prices of Peru large plate and ENM were basically flat with standard-quality copper, while CCC-P and Jinchuan were in firm premiums of 110-120 yuan/mt. The market now favoured non-standard non-registered brands, and the quotes were at flat levels.

Aluminium: The most-traded SHFE 2208 aluminium closed up 0.82% or 150 yuan/mt to 18,360 yuan/mt, with open interest down 4,740 lots to 177,901 lots.

The supply side was still under great pressure, while the demand side remained sluggish. In the spot market, downstream inquires picked up slightly after the prices dropped greatly in the past two days, but the transactions were still muted. Aluminium prices have already dropped to the instant cost.

Lead: The most-traded SHFE 2208 lead closed up 1.24% or 185 yuan/mt at 15,115 yuan/mt, with open interest down 2,583 lots to 49,300 lots.

In the spot market, discounts offered by smelters did not expand after lead futures prices rose, and some traders held back cargos with bullish outlook on the prices. Some secondary refined lead smelters set the ex-factory prices with discounts of 100-50 yuan/mt over SMM #1 lead, and the downstream purchased properly. SHFE lead bottomed out today.

Zinc: The most-traded SHFE 2208 zinc closed up 2.99% or 675 yuan/mt at 23,260 yuan/mt, with open interest down 3,845 lots to 113,034 lots.

The signals released by the US Fed meeting did not exceed expectations, hence the US dollar index dropped 20 points, easing bearishness in the market. SHFE zinc rebounded to the 23,000 yuan/mt level.

Tin: The most-traded SHFE 2208 tin closed up 0.82% or 1,540 yuan/mt at 189,110 yuan/mt, with open interest down 2,688 lots to 49,449 lots.

In the spot market, only a few smelters offered quotes in morning trade, which were unchanged from yesterday. Spot premiums rose slightly due to tighter supply, while market transactions subsided again amid rebounding tin prices. The actual transactions were mostly made with discounts, and the buyers mostly stood wait-and-see after tin prices rebounded.

Nickel: The most-traded SHFE 2208 nickel closed up 0.21% or 340 yuan/mt at 164,230 yuan/mt, with open interest up 2,302 lots to 83,048 lots.

Currently, the fundamentals of pure nickel changed little at present. Refined nickel output in June rose 8.74% MoM in June, and NPI supply was in obvious surplus. On the demand side, the stainless steel and alloy sectors remained sluggish amid resurging COVID again recently.

[Disclaimer: The above representation and data is based on market information SMM believes to be reliable at the time of acquiring as well as the comprehensive assessment by SMM research team, and any and all information provided in this article is for reference only. This article does not constitute a direct recommendation for investment or any decisions in any form and clients shall act on their own discreet and any decisions made by clients are not within the responsibility of SMM.]

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM's internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or for more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
9 mins ago
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Read More
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta Plans $2.3 Billion Expansion in India and Saudi Arabia, and Advances Tuticorin Smelter Restart
Vedanta has unveiled a major investment plan, under which Vedanta Copper intends to invest $2.3 billion in India and Saudi Arabia over the next three to four years, targeting annual copper production of more than 1 million tonnes by 2030. The company aims to produce 500,000 tonnes annually in both India and Saudi Arabia, alongside existing production of 100,000 tonnes in Fujairah, UAE. Around $2 billion will be invested in Saudi copper mining, smelting and rod projects, with an investment decision on the proposed Saudi copper smelter expected this quarter. Vedanta is also seeking to restart its Tuticorin copper smelter in India, which has been closed since 2018. The company expects a court ruling within three months and, subject to approval, plans to invest $250 million in refurbishing the facility, targeting a restart within eight to nine months and annual copper output of 250,000 tonnes. Meanwhile, its Silvassa facility is operating at around 95% capacity, with annualised copper cathode production exceeding 245,000 tonnes.
9 mins ago
London BTC flags copper and antimony at Nevada Black Star
2 hours ago
London BTC flags copper and antimony at Nevada Black Star
Read More
London BTC flags copper and antimony at Nevada Black Star
London BTC flags copper and antimony at Nevada Black Star
London BTC Company Limited (LSE:BTC, OTCQB:VINZF) announced on 5 October 2026 initial on-site pXRF results from its Black Star gold-critical minerals project in Pershing County, Nevada. A maiden programme collected 69 rock-chip samples along a 2.5km corridor between the Western and Eastern targets. pXRF readings showed antimony up to 0.44% Sb, copper up to 30.0% Cu, bismuth up to 0.73% Bi and silver up to 811 ppm Ag, with the antimony-copper association appearing at both ends of the corridor. The signature mirrors a historical 1985 sample 120m south of the claims (>1% Sb, 2% Cu, 700 ppm Ag). Earlier due-diligence sampling returned up to 16.23 g/t gold and 50.5 g/t silver. Samples are now with MSALABS for laboratory assays, with full multi-element geochemistry including antimony, tungsten and copper to follow. Copper, as a by-product credit, adds strategic appeal under US critical-minerals policy, though results remain preliminary field readings.
2 hours ago
Kantra extends Nugent copper-gold lode 70m below resource
2 hours ago
Kantra extends Nugent copper-gold lode 70m below resource
Read More
Kantra extends Nugent copper-gold lode 70m below resource
Kantra extends Nugent copper-gold lode 70m below resource
Kantra Copper Limited (ASX:KAN) reported underground diamond drilling at its Kanmantoo copper mine in South Australia that extends the Nugent lode 70m below the 2025 Mineral Resource Estimate and 370m beneath the current 950 Level stopping horizon. Hole 26KVUG0949 returned 70m at 1.18% copper and 0.24g/t gold from 507m, including 38m at 1.46% copper and 0.18g/t gold. Nugent, on the deposit's south-western edge, carries generally higher gold grades. By end-August 2026 the company had completed 38,535m of underground diamond drilling, including 12,024m at Nugent, and expects a resource update incorporating about 80,000m of drilling in late October. Kanmantoo is an operating mine that produced 3,170t of copper in the June 2026 quarter; 2026 guidance is 12,750-14,000t of copper, and the deep extension offers low-capital growth from existing infrastructure.
2 hours ago